NX Administration Services
NX Administration Services: One Consistent, Documented Siemens NX Setup
NX administration services cover the setup and ongoing care of a company’s Siemens NX environment: customer defaults at site, group and user level, templates and start parts, roles, drafting standards, the license server, packaged NX installations, Teamcenter integration settings, CAD standards and user support. inteliScience provides NX administration with NX engineers, as a project or as an ongoing service, so every designer works in the same documented NX setup.
Short answer
NX administration means deciding which Siemens NX settings the company controls and which each designer may change, and delivering them to every workstation the same way. Mainly through customer defaults at site, group and user level.
inteliScience is a Siemens NX, NXOpen and Teamcenter specialist with NX engineers delivering nearshore from Romania.
This page is about running NX day to day. Moving NX to a newer release is covered by NX release upgrade, and introducing NX for the first time by NX implementation and rollout. If your own administrator should learn the job, see NX administrator training. All of them belong to NX CAD design services.
NX administration services: the short version
- What it covers: customer defaults, templates and start parts, roles, drafting standards, the license server, installation packages, Teamcenter integration settings, standards and user support.
- Why it matters: when every workstation is set up differently, drawings, attributes and models differ too, and every upgrade turns into detective work.
- How we work: an inventory of your current setup, a target standard agreed with you, a central configuration tested before rollout, then ongoing care.
- How you can use it: as a defined setup project, as an ongoing service, or as backup for your own administrator.
- What it is not: Teamcenter server administration, license sales or a replacement for your IT security rules.
Why NX administration gets expensive when nobody owns it
In many design departments, NX administration is a side job. Someone set up the customer defaults years ago, templates were copied from project to project, and each designer changed settings at user level. The result shows up in the output: drawings to different standards, parts with missing attributes, models built on old start parts.
It also shows up at upgrade time, when nobody can say which settings were changed on purpose, and in support, when a problem appears on one workstation but not on the next. The knowledge often sits with one person. When that person is on vacation or leaves, the setup becomes something nobody dares to touch.
How customer defaults work in Siemens NX
Customer defaults are edited in NX under File, Utilities, Customer Defaults. Siemens describes this as the place where most administrative changes are made when NX is set up (Siemens NX Design blog, April 2024). The levels build on each other:
Siemens NX customer defaults: three levels, each inheriting from the one above
Company standard
Set by administration for everyone. Settings that must not change are locked here.
Department or project
Inherits the site settings and adds what differs, for example a customer’s drawing standard.
Personal settings
What each designer may set, wherever no higher level has locked the setting.
A lock at a higher level wins. The site and group levels are switched on through environment settings and stored as one file per level. The shipped defaults NX comes with are read-only.
Two details matter in practice. Part-related defaults apply to new parts created from the blank template, not to existing parts or parts created from other templates. Session defaults take effect after NX is restarted. We decide with you what belongs at site level, what differs per group and what designers may set themselves. The settings themselves are explained step by step in our guide to NX customer defaults.
What NX administration covers
| Area | What is managed | What we do |
|---|---|---|
| Customer defaults | Site, group and user levels, locks and the values that differ from the shipped settings | Set up the levels, lock what must not change and document every setting that differs from the shipped value |
| Templates and start parts | Template files and start parts with layers, reference sets and attributes; separate template sets for native NX and for Teamcenter | Build and maintain one template set to your standard for models, drawings and assemblies |
| Drafting standards | The drawing standard settings for dimensions, notes, symbols and views | Set up your drawing standard once, at site or group level, instead of on each workstation |
| Roles and user interface | The roles that define which tools and which layout designers see, and the default role | Build roles for your job profiles, deploy them centrally and set the default role |
| License server | Siemens License Server, license files, bundle selection and license borrowing | Install and update the license server, set up bundles and borrowing, and report license usage |
| Installation and updates | Silent installation packages, network or local installations, monthly updates and new releases | Package NX with your settings for silent deployment and keep updates on a documented routine |
| Customizations | In-house NXOpen tools, menus and ribbon buttons, loaded from shared directories at startup | Deploy them from one central location, signed and versioned, so every workstation loads the same |
| Teamcenter integration settings | Integration customer defaults in NX and Teamcenter preferences: attributes, check-out policy, default group, file handling | Align both sides, test them on real items and document them |
| Standards and checks | Modeling and drawing standards, and checks before release | Write the standards down and back the important ones with checks in NX |
| User support | Questions, error messages, onboarding of new designers | A support channel with response times agreed in the contract; recurring questions become documentation or training |
Roles deserve a word. Siemens defines NX roles as predefined settings that determine the available tools and the overall layout of the screen, with content roles such as Essentials and Advanced as starting points (Siemens NX Design blog, April 2024). A role built for your job profiles keeps the ribbon focused on the commands each group really uses.
With NX X, part of the job moves to Siemens: users are assigned in the Siemens Xcelerator Admin Console, and installations and updates come through Siemens Software Center (Siemens Designcenter blog, August 2025). Customer defaults, templates, roles and in-house tools still need an owner.
What you get from NX administration services
Your current setup, documented
Every changed default, template, role and tool, and where the workstations differ from each other.
One central configuration
Site and group levels, locks, templates and roles, tested before they reach your designers.
A package your IT can roll out
A silent installation with your settings, and a routine for monthly updates and new releases.
A license server that keeps running
Up to date and documented, with usage reports when you plan renewals or new seats.
Integration settings that match
NX defaults and Teamcenter preferences aligned, tested and written down.
Engineers who know your setup
Named NX engineers, a support channel, and documentation that grows with each request.
How we take over NX administration
- Inventory. We read the current customer defaults per level, templates, roles, drafting standards, environment settings, the license setup and your in-house tools, and compare several workstations.
- Target standard. With you, we decide what is locked at site level, what differs per group and what designers may set themselves.
- Central configuration. Site and group levels, templates, roles and customizations are built and tested in a separate environment.
- Pilot group. A few designers work with the new configuration on real parts, and we adjust what gets in their way.
- Rollout. The configuration reaches all workstations, through your software distribution or a package we build for it.
- Ongoing care. Change requests, monthly updates, new releases, user support and documentation, under a service agreement.
Project, ongoing service or backup for your administrator
| Model | What it covers | Good fit when |
|---|---|---|
| Setup project | Inventory, target standard, central configuration, templates, roles and a deployment package, with a defined end | Your setup has grown without a plan, or a new site or team starts with NX |
| Ongoing NX administration | Change requests, updates, license server care, user support and documentation, at agreed response times | You have no dedicated NX administrator, or the role is a side job |
| Backup for your administrator | Cover during vacations and peaks, packaging, upgrades and difficult cases | You have an administrator, but no second person who knows the setup |
In every model, the work is done by NX engineers employed by inteliScience under a service agreement. Our project lead plans the work and coordinates it with your contact person, and changes to your production setup are only made after your approval.
Where AI helps in NX administration
Many admin requests repeat: a new material entry, a changed customer default, an error message from an in-house tool. An AI assistant can answer user questions from your documented standards and prepare such changes for review. The administrator decides, and nothing shared changes without that review. Which admin tasks an assistant can prepare today is covered in NX administration AI.
What NX administration services do not cover
- No Teamcenter server administration. Teamcenter servers, volumes and the database are a separate service: Teamcenter support and managed services.
- No license sales in this service. License models and quotes are covered on Siemens NX licenses.
- No changes in production without your approval. Every change is tested first and released by you.
- No replacement for your IT security rules. Accounts, access and network follow your policies.
- No undocumented settings. Everything that differs from the shipped value is written down, so you are never tied to one person, including us.
NX administration services and their neighbors on this site
| Page | Type | What it answers |
|---|---|---|
| NX customer defaults | Guide | How customer defaults are set, exported and locked, step by step |
| NX administration AI | Guide | Which admin requests an AI assistant can prepare for review |
| NX administrator training | Course | Training your own NX administrator |
| NX release upgrade | Service | Moving NX to a newer release with tools and standards tested |
| Engineering process optimization | Service | How the team works in NX, beyond how NX is set up |
| Custom NX quality checks | Service | Your company’s design rules as checks in NX |
| NX implementation and rollout | Service | Introducing Siemens NX in a company for the first time |
| Teamcenter support and managed services | Service | Operation and support of the Teamcenter side |
| Siemens NX licenses | Page | License models, NX X and how to request a quote |
| NX administration services (this page) | Service | Setup and ongoing care of your Siemens NX environment |
Our team’s experience with NX administration
We only list what our engineers have done, without customer names. Some of it comes from projects before inteliScience.
- Our team has packaged NX installations as MSI packages with scripted deployment and logging for a large engineering organization, and run them in a restricted Citrix environment with a role and permission concept, documentation and release management.
- Our team has built NX and Teamcenter integrations in C# and NXOpen with attribute and naming standards.
- Our team has built design-rule checks for company-specific design guidelines that designers run while they work, so violations show up before release.
- Our team has built a library of reusable design elements, such as standard parts, features and templates, that are placed in NX and Teamcenter with the correct attributes and naming.
Where checks are the main need, see custom NX quality checks. Where the question is how the team works rather than how NX is configured, engineering process optimization is the better start.
Start with an NX admin baseline
We do not start by changing settings. We start by writing down how NX is set up today, because that is what every later decision builds on.
Scoping call · fixed quote
NX admin baseline
Your current NX setup, documented and compared across workstations, with a proposal for the target standard.
- Customer defaults by level, templates, roles and drafting standards
- License setup, installation and in-house tools
- Where workstations differ, and what that costs in practice
- A fixed quote for the setup project or the ongoing service
Fixed quote after a short call · under NDA
Other ways to start
Want an outside view first?
Two existing formats look at your NX process as a whole, including your standards.
- Free Intro Call with Live Demo: 45 minutes by screen share with a live demo, €0
- NX Engineering Assessment: a one-week scored review of templates, standards and workflows, €4,900 fixed
Frequently asked questions about NX administration
What does a Siemens NX administrator do?
What are customer defaults in Siemens NX?
What is the difference between site, group and user customer defaults in Siemens NX?
How is Siemens NX deployed to many workstations?
How are custom roles created and distributed in Siemens NX?
Which Teamcenter settings affect Siemens NX?
Can Siemens NX administration be outsourced?
Should a company train its own NX administrator or outsource NX administration?
Tell us how NX is set up today, and who looks after it.
We look at your customer defaults, templates and installation, tell you what we would standardize first, and whether a project or ongoing care fits better.
Talk to an NX EngineerSiemens NX, NXOpen and Teamcenter specialists · nearshore from Romania · under NDA

