Configuration & Traceability AI
One design. Forty serial numbers. Three decades of changes. Prove they match — that is the contract.
Every defence system exists in three truths at once. As-Designed: what the drawings and the Teamcenter BOM define, at exact revisions and baselines. As-Built: what was actually manufactured and delivered, per serial number, per vessel, per customer nation. As-Maintained: what stands in the field today, after refits, retrofits and modification programmes. STANAG 4427 and its ACMP framework — and behind them, your customers’ acceptance authorities — demand that these three truths stay reconcilable for the entire service life. Thirty to fifty years. Per unit.
The industry knows how hard that is: when a fleet gets consolidated onto a “new reference configuration” — the Leopard 2 A8 pattern — it is precisely because decades of divergence made the old baseline unmanageable. In daily practice the reconciliation runs on the most fragile tooling imaginable: experienced people, spreadsheets, and weeks of cross-checking between PLM, ERP build records and change paperwork whenever an audit or a customer question lands.
We automate the accounting layer underneath: AI and rules continuously compare As-Designed against As-Built and the change history, flag every gap and conflict with the evidence attached, assemble configuration status reports on demand — and answer “which serials does this change affect?” as a query instead of a research project. Inside your perimeter, on the sovereign stack. Your CM boards keep deciding; the machine keeps the books.
// Configuration reality, in numbers
Configuration drift is silent — until the audit, or the incident
Nobody decides to let configurations drift. It happens one exception at a time: an approved change incorporated on serials 12 onwards but never back-annotated for the retrofit batch; a build deviation documented in a PDF that never reached the PLM; a country variant whose delta to the baseline lives in one programme manager’s head. Each is small. Compounded over ten thousand changes and forty serials, they become the state every CM manager knows and no one admits: the official records and the physical fleet disagree, and nobody can say exactly where.
The costs arrive in three forms. Audit findings — an FCA/PCA that surfaces inconsistencies you could have found first, with your acceptance authority watching. Operational risk — a refit planned against As-Designed data that doesn’t match the vessel that actually arrives in the yard. And pure effort: Configuration Status Accounting done by hand, weeks per audit, spreadsheets per fleet, and the constant background tax of answering “which configuration is unit X in?” from memory and folders.
The absurdity is that the evidence mostly exists — in Teamcenter revisions and effectivities, in ERP build records, in change documents, in acceptance protocols. It is scattered across systems that were never reconciled by machine. That reconciliation is exactly the kind of tireless, rule-governed cross-checking AI is built for — and exactly the kind humans are worst at sustaining for thirty years.
// Consistency check — S/N 0043, cooling system · run before the refit, not during it
1,842 record pairs compared · Teamcenter BOM ⟷ build records ⟷ change history · full report attached to the item
How the accounting layer works
The system does one thing relentlessly: connect the records that describe the same physical reality, and report where they disagree. It sits on top of your existing systems — it does not replace your PLM, your ERP or your CM process:
The three truths, sourced
- Teamcenter BOMs, revisions, effectivity
- ERP / build records per serial
- Change docs — digital and mined paper
- Acceptance & maintenance protocols
Same reality, one model
- Parts ↔ changes ↔ serials ↔ platforms
- Country variants as deltas to baseline
- LLM extracts from unstructured docs
- Every link keeps its source
Disagreements, found by machine
- As-Designed ⟷ As-Built per serial
- Approved-but-not-incorporated ECPs
- Deviations missing from the PLM
- MATCH / GAP / CONFLICT with evidence
CSA on demand — humans release
- Config status reports, drafted
- Audit evidence packs (FCA/PCA)
- Fleet & ECP-impact queries
- Your CM board decides — always
Four jobs the accounting layer does
Once the records are linked and continuously checked, four chronic pains become routine operations:
Audit preparation that finds findings first
Before every FCA/PCA, the consistency check runs fleet-wide: gaps and conflicts surface with evidence attached, verification tasks are drafted, and you walk into the audit with your own findings list — resolved or explained — instead of discovering it live.
Fleet configuration, queryable
"Which configuration is unit X actually in?" — answered from linked records, per serial, with the delta to baseline and every unincorporated change visible. Refits get planned against reality, not against hope.
ECP impact in minutes
A change is proposed: which serials, variants and platforms does it touch, what does it collide with, which prior changes does it depend on? The impact half of change management becomes a query — your board spends its time on the decision, not the research.
Legacy change history, recovered
Decades of paper ECRs, deviation sheets and acceptance protocols are mined into the structured history — the same pipeline as our drawing mining. The changes that only exist as scanned signatures finally enter the accounting.
Who this is for
You are a candidate if most of these apply:
- You deliver or support systems under STANAG 4427 / ACMP-grade configuration management — with FCA/PCA audits and official acceptance.
- Your fleet spans serial-number-level configurations — vessels built as individuals, vehicle batches, country variants.
- Configuration Status Accounting runs on spreadsheets and veterans — and audit prep costs weeks, every time.
- Part of the change history exists only as paper and scanned PDFs from earlier decades.
- You run Teamcenter (or a comparable PLM) beside an ERP — and the two have never been reconciled by machine.
- Your records are VS-NfD or export-controlled — the accounting must run inside your perimeter.
What the accounting layer is built on
Your systems stay the systems of record — the layer connects and checks, on infrastructure you control.
Before and after: six weeks to the PCA
The physical configuration audit for a vessel class is scheduled. Here is how the six weeks before it run, on each side of the change:
Before — the spreadsheet campaign
- Task force assembled, programme work parked — 6 wks
- PLM, ERP and binders reconciled by hand, serial by serial
- Known problem areas quietly hoped past
- The auditor finds the unincorporated ECP anyway — finding, action plan, follow-up audit
- Next audit: same campaign, from zero
After — continuous accounting
- Consistency state is known on day one — checks ran all year
- Open GAPs and CONFLICTs carry drafted verification tasks — worked, not feared
- Evidence packs generate per audit scope — hours
- You present your own findings list, with resolutions — the audit becomes a review
- The task force goes back to being engineers
Why inteliScience — and what the AI deliberately does not do
Configuration management is, at its data core, a Teamcenter discipline — revisions, effectivity, baselines, change objects — married to an ERP and buried under decades of documents. That combination is precisely our home ground: we build Teamcenter customizations on supported interfaces every day, and our document AI reads the unstructured half of your change history. No generic AI consultancy brings both; no CM tool vendor reads your 1994 deviation sheets.
The boundaries, stated plainly. The AI does not do configuration management. Your CM plan, your boards, your approvals remain process and people — the machine is the accounting layer underneath: it finds disagreements, drafts reports and verification tasks, and assembles evidence; it approves nothing and incorporates nothing. It does not paper over gaps. Where the As-Built documentation simply has holes, the system makes them visible and lists them — which, before an official audit, is exactly what you want: a known gap with a verification plan beats an unknown gap with an auditor’s flashlight on it. And because these records describe defence systems, the whole layer runs inside your perimeter, on the sovereign air-gapped stack, with markings honoured per user.
Fixed price — no day rates, no surprises
Configuration Accounting Pilot
- One system or platform family — As-Designed / As-Built sources connected inside your perimeter
- Consistency check run across the available records — measured findings list (MATCH/GAP/CONFLICT)
- Sample of legacy change documents mined into the structured history
- CSA report and audit evidence-pack demo, reviewed with your CM team
- Rollout blueprint: more platforms, continuous checking, audit calendar alignment
8–10 weeks · runs entirely on your infrastructure · findings and reports are yours, whatever you decide afterwards.
For comparison
The spreadsheet status quo
- Weeks of task-force reconciliation before every audit, fleet-wide, by hand
- Findings, action plans and follow-up audits for conflicts a machine finds in seconds
- And the operational risk: refits planned against records the vessel doesn't match
Frequently asked questions
Does this replace our CM process or tools?
Our As-Built documentation has real gaps. What happens then?
How does the AI handle decades of paper change documents?
Where does all this run? These records describe weapon systems.
Our fleet has drifted for 20 years. Isn't it too late for this?
Can we start with one system instead of the whole platform?
Your next configuration audit is already on the calendar. Find your findings before the auditor does.
Pick one system whose records you trust least — we'll run the first consistency check on it, inside your perimeter, and review the map together.
Talk to a Configuration AI Engineerget in touchWe are always ready to help you and answer your questions
Always here to support you – reach out to us with your questions, and we’ll guide you every step of the way.
- Phone
- +40 774 463 429
- Our Location
- Str. Ploiești 9, 400157
Cluj-Napoca, Romania - inteliScience on LinkedIn
- YouTube
- inteliScience on YouTube

