AI DFM & Quotation Check
Seven out of ten quotes are engineered for orders you never win. Stop paying full engineering price for them.
Engineering-to-order has a quiet margin leak, and it sits at the quotation desk. Every serious RFQ — a component family, a weldment, a machined part, a subassembly — costs days of skilled work before any revenue exists: reading drawings, judging whether your machines can hold the tolerances, estimating cost, writing the offer. At typical ETO hit rates below 30 percent, most of that effort is spent on bids that go nowhere — while enquiries you could have won wait in the queue.
The bitter part: the highest-leverage decision in the whole process — quote, quote with deviations, or no-bid — is made earliest, with the least information, under the most time pressure. It depends on knowledge that lives in three places: the RFQ documents, your real manufacturing capabilities, and your part history. All three are data. None of them are connected.
We connect them: AI extracts the technical content from incoming RFQs, checks it against your actual capabilities — machine envelopes, achievable tolerances, materials, processes — finds the most similar parts you have already made (with their post-calculations), and hands your estimator a triage verdict with evidence. In minutes, not days.
// The quotation margin leak, in numbers
The no-bid decision is your most expensive gut feeling
Ask your quotation team how they decide which enquiries get worked first — and which get declined. The honest answer, in most machine-building and component businesses: experience, gut feeling, and whoever shouts loudest. Not because your estimators lack judgement, but because the information their judgement needs is expensive to gather. Whether a tolerance is comfortably within your machines’ capability or right at the edge, whether that exotic material has ever been through your shop, whether a nearly identical part was quoted two years ago and lost on price — each of those answers exists somewhere, and each costs hours to dig up.
So the digging only happens for enquiries someone already believes in, the belief forms before the facts, and three failure modes repeat forever: you fully engineer quotes that were never winnable, you no-bid enquiries that a five-minute capability check would have revealed as easy wins, and you win orders whose real manufacturing cost surfaces later — in the shop, as margin erosion nobody priced.
Triage-with-evidence fixes the order of operations: facts first, effort second. The AI does the digging for every enquiry, in minutes — your estimators apply judgement to prepared facts instead of forming beliefs in the dark.
// Monday morning — three new RFQs, triaged before the first coffee
Comfortable fit — and a cost reference exists
- All tolerances within capability, margin ≥ 40% of tolerance band
- Material 1.2312 — machined 214× in your history
- Closest part: 94% similar, post-calc attached
- Suggested action: quote from reference — est. 2 h effort
One characteristic at the edge — price it, don't absorb it
- Ø 40 h5 over 480 mm: at grinding capability limit
- History: similar feature caused 2 rework loops in 2024
- Suggested action: quote with h6 alternative or priced risk premium
- Evidence pack for the customer call: prepared
Outside your envelope — decline in 5 minutes, not 5 days
- Part exceeds largest machining envelope by 380 mm
- Post-weld annealing required — no in-house process, sub-supplier margin ≤ 0
- Suggested action: reasoned no-bid same day — goodwill intact
- Engineer hours saved: ~3 days
Every verdict is a recommendation with evidence — the decision stays with your estimator. The point is not that the AI decides; it is that your people decide first thing Monday with facts that used to take all week.
How the check works — against your capabilities, not generic rules
Generic DFM checkers apply textbook rules. Yours is different, because the question is never “is this manufacturable” — it is “is this manufacturable by us, at margin“. That requires your data on both sides of the comparison, and it is exactly what we build:
The RFQ, as it arrives
- 2D drawings (PDF, scans)
- STEP / native models
- Specs & requirement lists
- Email attachments included
The technical content, structured
- Dimensions, tolerances, GD&T
- Materials, surfaces, heat treatment
- Quantities, deadlines, standards
- Confidence-scored, source-linked
Against your capability profile
- Machine envelopes & processes
- Achievable tolerance tables
- Material & treatment experience
- Similar parts + post-calculations
Verdict with evidence
- Quote / deviate / no-bid
- Cost frame from references
- Risk flags, priced not absorbed
- Estimator decides — always
When does the quotation check pay off?
The value scales with enquiry volume and the share of engineering in each quote. You are a candidate if most of these apply:
- You handle hundreds of RFQs per year — machined parts, weldments, components or subassemblies to customer print.
- Serious quotes cost days of engineering, and hit rates sit well below 50 percent.
- No-bid decisions are made on gut feeling — and sometimes regretted in both directions.
- Manufacturing feasibility problems surface after order intake, as rework and margin erosion.
- Your part history and post-calculations exist in Teamcenter, SAP or archives — but nobody can search them at quoting speed.
- Capacity is tight: you’d rather spend engineering hours on winnable bids and booked orders.
What the check is built on
Your data on both sides of the comparison — connected through the systems you already run.
Before and after: the same week of enquiries
Fifteen RFQs land in a normal week. Here is how the week runs on each side of the change:
Before — first come, first served
- Enquiries worked in arrival order — winners wait behind losers
- Drawing review & feasibility per RFQ — 2–5 days each
- "Have we made something like this?" — asking around, folder digging
- Capability risks discovered in the shop — margin quietly eroded
- 5 of 15 quotes ship late or never — unquantified lost revenue
After — triage first, effort second
- All 15 RFQs triaged with evidence — Monday, 9:00
- Engineering hours flow to the winnable — references attached
- Capability risks priced into the quote — or quoted as deviation
- No-bids declined same day, with reasons — customers respect it
- Same team, more quotes out, higher hit rate — measured, not hoped
Why inteliScience — and what this deliberately is not
Instant-quoting platforms exist — for sheet metal, for simple turned parts, for commodity machining. They work where parts are simple enough that a price can be computed from geometry alone. Your business is not that: machine building and complex components live on judgement about risk, capacity and customer relationships. So we don’t sell you a quoting robot. We sell your estimators a head start — the facts, gathered and checked, before their judgement begins. The verdict cards recommend; your people decide and sign every quote.
The second difference is whose rules the check runs on. Generic DFM tools apply textbook manufacturability rules; ours runs on your capability profile — machine envelopes, tolerance tables per process, material history, and the similarity search over your own parts and post-calculations in Teamcenter and SAP. Building that profile is real work (we do it together with your manufacturing and quotation people in the pilot), and it is precisely why the result is defensible in front of a customer where a generic checker is not.
And because RFQ documents are your customers’ IP under NDA, the pipeline runs on your infrastructure — on-premises or EU cloud. Nothing your customers send you is shipped to a public AI service.
When the open question is not manufacturability but which past projects and parts already solved a similar task, see our AI similar project search and our CAD similarity search.
Fixed price — no day rates, no surprises
Quotation Check Pilot
- Capability profile built for one manufacturing area — with your AV and quotation team
- Extraction + triage run on 20 historical RFQs — validated in hindsight against what actually happened (won, lost, margin)
- Similar-part matching demo on your Teamcenter / order history
- Accuracy & hindsight report reviewed with your estimators
- Rollout blueprint: live RFQ intake, Teamcenter/SAP integration, more areas
4 weeks · runs on your data, on your infrastructure · results are yours, whatever you decide afterwards.
For comparison
The cost of blind quoting
- ~70% of quotation engineering spent on bids that were never winnable
- Won orders that erode margin because capability risk wasn't priced
- And the invisible line: winnable enquiries that waited too long and went elsewhere
Frequently asked questions
Is this one of those instant-quoting portals?
Where does the "capability profile" come from — is that a big data project?
How good is the extraction from customer drawings?
Can we trust a no-bid recommendation?
Our RFQs are under customer NDA. Where does processing run?
How does this relate to your tender engineering offer for the energy sector?
Your estimators' judgement is excellent. Give it facts instead of folders.
Send us three past RFQs — one you won, one you lost, one you regret — and we'll show you what the triage would have said, with evidence.
Talk to a Quotation AI Engineerget in touchWe are always ready to help you and answer your questions
Always here to support you – reach out to us with your questions, and we’ll guide you every step of the way.
- Phone
- +40 774 463 429
- Our Location
- Str. Ploiești 9, 400157
Cluj-Napoca, Romania - inteliScience on LinkedIn
- YouTube
- inteliScience on YouTube