Contacts
Get in touch
Close

Contacts

Romania, Cluj-Napoca – 400157
Str. Ploiești Nr. 9

Romania, Vama – 447350
Str. Fermei Nr. 14

+40 774 463 429

info@inteliscience.net

Post Builder to Post Configurator: NX Migration Guide 2026

Post Builder to Post Configurator: The Short Version

Moving from Post Builder to Post Configurator means turning each NX postprocessor into a layered Post Configurator post: inventory first, then convert with the Siemens add-on or rebuild, then prove the new NC output against the old. inteliScience CAM engineers accept every migrated post with a test part on the real machine and a protocol both sides sign.

Step What happens Result
1. InventoryEvery post, its machine, custom commands and ownerA list of the posts that matter
2. BaselineReference programs posted with the old postThe NC output to match
3. Convert or rebuildSiemens converter, controller library or Post Hub postA Post Configurator post
4. CompareSame programs, new post, line by lineEvery difference fixed or explained
5. Machine testDry run, test part, protocol signed by both sidesA post cleared for production
6. Side by sideOld post frozen, switch per machine, retire laterA rollback path until proven

The Problem: Production Still Runs on Post Builder Posts

Many NX shops that have programmed CNC machines for ten years or more still post with Post Builder. The posts work, and that is exactly why nobody touches them.

Siemens stopped developing the tool years ago. The Post Builder repository of Siemens’ NX team on GitHub (6 stars when we checked on 7 October 2026) says development “is finally stopped with 1953 series”, lists PB1980 as the final release (2021) and announces critical maintenance with “no updates”. The same page states that Post Configurator reached complete production status with NX 1899 and recommends it for new projects and for converting existing Post Builder posts. Siemens also builds the posts in its Post Hub library with Post Configurator.

Then there is the release calendar. NX ships twice a year, in June and December. Version 2606 arrived in June 2026, and Siemens showed the next one, 2612, in its September 2026 Early Access Program, which ran from 31 August to 25 September. Every release raises the same question for every post: does it still write the same code? For a Post Builder post with years of custom commands, the person who can answer is often the one who wrote them, and that person may have left.

The real risk is not that a Post Builder post stops working tomorrow. It is that the post cannot be changed safely at the moment you have to change it.

Our clear recommendation: migrate machine by machine on your own schedule, starting with the post that is hardest to maintain, instead of waiting for a release that forces the issue. If you want the background first, our guide explains how NX CAM posts, Post Hub and the buy-off fit together.


Step 1: Take Inventory Before You Convert Anything

A migration starts with a list, not with the converter. For each post you need the machine and controller it drives, the custom commands it contains, the user-defined events your programmers call, who changed it last, and two or three NC programs your operators trust. Without that list, nobody can say later whether the new post is right.

The NX side is quick to collect. Posts are registered in a configuration file, usually template_post.dat, one line per post: the name shown in NX, the event handler (.tcl) and the definition file (.def). The script below sorts each registered post by the files beside its event handler: a Post Builder post keeps its session file (.pui) there, a Post Configurator post is built around an XML entry file (.psc). It also counts Post Builder custom commands (Tcl procedures named PB_CMD_...) and notes whether a .cdl file for user-defined events exists.

# post_inventory.py: list the NX posts registered in template_post.dat and
# classify them by the files next to the event handler (.tcl).
# Python 3, standard library only. Read-only: it changes nothing.
# Usage: python post_inventory.py template_post.dat > post_inventory.csv
import csv
import datetime
import os
import re
import sys
from pathlib import Path

writer = csv.writer(sys.stdout)
writer.writerow(["post", "type", "custom_commands", "ude_file", "tcl_modified", "tcl_path"])

for line in Path(sys.argv[1]).read_text(errors="ignore").splitlines():
    fields = [f.strip() for f in line.split(",")]
    if line.lstrip().startswith("#") or len(fields) < 3:
        continue  # comments and lines that are not post entries
    name, tcl = fields[0], Path(os.path.expandvars(fields[1]))
    if not tcl.exists():
        writer.writerow([name, "file missing", "", "", "", tcl])
        continue
    if tcl.with_suffix(".psc").exists():
        kind = "Post Configurator"      # XML entry file that loads the layers
    elif tcl.with_suffix(".pui").exists():
        kind = "Post Builder"           # session file that Post Builder edits
    else:
        kind = "check manually"
    code = tcl.read_text(errors="ignore")
    custom = len(re.findall(r"^\s*proc\s+PB_CMD_\w+", code, re.MULTILINE))
    modified = datetime.date.fromtimestamp(tcl.stat().st_mtime).isoformat()
    writer.writerow([name, kind, custom, tcl.with_suffix(".cdl").exists(), modified, tcl])

Run it in the same environment as NX, so that ${UGII_CAM_POST_DIR} in the paths resolves to your post directory. A “file missing” row is a finding in itself: a post that NX offers but that cannot run.

The script counts. It does not judge. The rest of the inventory comes from people:

What to record per post Why it matters
Machine, controller and controller software versionMachine builders configure the same controller differently
Every custom command and what it is forThe parts a converter may carry over, change or leave out
User-defined events in useA missing one breaks programs, not the post
Edits made directly in the .tclPost Builder writes the .tcl from the .pui, so hand edits are missing there and the next save can overwrite them
Edits operators make at the controlIn nobody’s file; they become post logic or are dropped on purpose
Linked posts (mill-turn, head changes)Several posts for one machine that must stay consistent
Two or three trusted NC programsThe reference, accepted by the people at the machine

We’d advise against converting any post that has no owner on your side. If nobody can say what a custom command is for, it goes on the list as an open question, not into the new post by default.


What Converts, What to Check, What to Rebuild

Siemens offers an add-on that converts Post Builder posts to Post Configurator automatically and, in Siemens’ words, preserves existing customizations. Output formats and standard events are the predictable part. Custom commands, user-defined events, linked posts and hand edits are where a converted post needs an engineer to check it, and some of them are better rebuilt.

How the two tools build a post

A Post Builder post is a set of files generated from one session file: the .tcl event handler, the .def definition file with word formats, addresses and block templates, and a .cdl file for user-defined events. Standard logic and your customizations end up in the same event handler.

Post Configurator keeps Tcl underneath but builds the post in layers, loaded by an XML entry file in a fixed order: the Siemens controller library first, then the machine builder and machine layers, then your own. Settings are properties in the interface, customizations sit in their own layer, and a layer can be reused for the next machine. That is why an NX upgrade with a Post Configurator post is mostly a check of your own layer, not a search through one long file.

What the Siemens converter does

The converter is not new. Siemens published its first version in June 2020, with a video series on its “Inside Post Configurator” channel, and the Siemens Community tech tip on converting Post Builder posts, written for NX CAM 2606, describes the current add-on: automatic conversion that keeps existing customizations. Siemens’ own video on converted items is just as clear about the limit. It shows the files a conversion creates and the items that are excluded because they collide with the Post Configurator architecture.

Element of the Post Builder post What to expect after conversion What we check
Word formats, addresses, block templates (.def)The most predictable partDecimal points, leading zeros, modal codes
Standard events: program start and end, tool change, motion, cyclesMapped onto the Post Configurator structureEvery event the reference programs use
Custom commands (PB_CMD_ procedures)Kept, except items that collide with the architectureStill needed, still firing at the same event, or replaceable by a library option
User-defined events (.cdl)Must still appear in NX and write the same outputThe event dialog in NX and its NC output
Linked posts for mill-turn or head changesThe hardest casePlanned as a rebuild with its own test plan
Hand edits in the .tclMay not match the .puiSave the .pui from Post Builder into a copy folder, compare both .tcl files
Operator edits at the controlNot in any filePer edit: new post logic, or dropped on purpose

In practice, the converter decides how much typing you save. It does not decide whether the post is right. Only the NC output does.


Convert, Rebuild or Start From a Post Hub Post

Convert when the Post Builder post is clean and its custom commands are understood. Rebuild in Post Configurator when the post is a patchwork nobody can explain or the machine is complex. Start from a Post Hub post when Siemens already has one for your machine and controller. And leave posts alone for machines that leave production soon.

Situation Route Why
Post Hub has a post for your machine, controller and optionsStart from the Post Hub post, add only your real customizationsSiemens maintains the base; you maintain a thin layer
Clean Post Builder post, few custom commands, all documentedConvert with the Siemens add-on, then compareThe converter saves the most work where the post is already orderly
Many custom commands, several authors, no documentationRebuild in Post Configurator from the controller libraryConverting carries old problems into a new format
Mill-turn, multi-channel or linked postsRebuild as a project of its own, ideally with machine simulationToo many interactions to trust a converted result
Machine leaves production within a year or twoFreeze the post, do not migrateMigration effort that never pays back

Our clear recommendation for patchwork posts: rebuild, and use the old post’s NC output as the specification, not its code. A rebuild does not start from zero: the trusted programs from step 1 define what correct means, and the controller library often covers functions that once needed a custom command.


Prove the New Post: Reference Programs, Comparison, Test Part

A migrated post is proven in three steps. Post a fixed set of reference programs with the old post before converting; this is the baseline. Post the same programs with the new post and compare line by line. Then run a dry run and a test part on the machine, and record the result in an acceptance protocol that both sides sign.

Build the baseline before you convert

The reference programs should cover everything the shop actually uses: program start and end, every kind of tool change, work offsets, cutter compensation on and off, each cycle (drilling, peck drilling, tapping, boring), subprogram calls, every user-defined event, and, on machines with rotary axes, positioning, 3+2 work and tool center point mode. Post them with the old post, while it is still untouched, and store the NC files with the post version and the NX release. That output is the baseline.

Compare the NC output

Block numbers and comments change for harmless reasons when a post is rebuilt, so compare without them first. The script below does that for ISO-style code (Fanuc, SINUMERIK) and for conversational code with plain block numbers, and returns a non-zero exit code when it finds a difference, so it can run over a whole folder of reference programs.

# nc_compare.py: compare the NC output of the old and the new post for
# the same reference program, ignoring block numbers and comments.
# Python 3, standard library only.
# Usage: python nc_compare.py baseline/REF_01.nc converted/REF_01.nc
import difflib
import re
import sys


def normalize(path):
    lines = []
    with open(path, encoding="latin-1") as nc:
        for raw in nc:
            line = raw.strip()
            line = re.sub(r"^(N\d+\s*|\d+\s+)", "", line)   # N10 (ISO) or 10 (conversational)
            line = re.sub(r"\(.*?\)", "", line)             # (comments)
            line = re.sub(r"\s*;.*$", "", line)             # ; comments
            line = re.sub(r"\s+", " ", line).strip()
            if line:
                lines.append(line)
    return lines


old, new = normalize(sys.argv[1]), normalize(sys.argv[2])
diff = list(difflib.unified_diff(old, new, sys.argv[1], sys.argv[2], lineterm="", n=2))
print("\n".join(diff) if diff else "No differences after normalization.")
sys.exit(1 if diff else 0)

A typical finding looks harmless:

--- baseline/REF_01.nc
+++ converted/REF_01.nc
@@ -3,5 +3,5 @@
 G90 G17 G40
 T1 M6
-G0 X10. Y0.
+G0 X10 Y0
 M30
 %

It is not harmless. On many Fanuc controls, a coordinate without a decimal point is read in the smallest input increment, so X10 can mean 0.010 mm instead of 10 mm unless calculator-type decimal input is switched on. Comments and the program header need a second, separate look, because tool lists and setup notes live there.

The goal is not zero differences. A new post can be better than the old one, for example when it calls the controller’s own drilling cycle where the old post wrote every move out. But each difference is either fixed or explained in writing, never left as “probably fine”.

Dry run, test part, signed protocol

Only then does the post go to the machine: a dry run first, then a test part with the operator at the control. The acceptance protocol records the machine, the controller and its software version, the post name and version, the NX release, the reference programs and the result of each check, signed by your production or CAM lead and by whoever built the post. A year later, when a program behaves differently, it shows what was tested and on which release.

A converted post that passes the comparison on your desk is not yet a production post. What is still missing: a test part on the real machine, an acceptance protocol both sides sign, and a retest at every NX release. Our CAM engineers do exactly that, one machine at a time: NX postprocessor development, with an entry offer of one machine, one post from €5,000 and migrations quoted after the requirements questionnaire.


Keeping Old and New Posts Side by Side

Keep both posts for a while. Register the new post under its own name next to the old one, freeze the old post, switch one machine at a time after acceptance, and retire the old post only after the new one has passed its first NX upgrade retest. Until then, the old post is your rollback path.

Register both, under clear names

Both kinds of post run in the same NX postprocessing environment, so the converted post can sit next to the original in the post list, for example as MILL5_840D_PC beside MILL5_840D. Have every post write its name and version into the program header, so an operator who finds an odd block sees at once which post wrote it.

Freeze the old post

Once the baseline exists, the old post gets no more changes. Fixes go into the new post only; two posts that both receive fixes drift apart, and the baseline stops meaning anything.

Switch per machine, not per hall

After the protocol is signed, new programs for that machine are posted with the new post only. Released programs that are proven on the machine stay as they are; an old CAM setup that is posted again goes through the new post. Tell programmers and operators the date, and take the old post out of the list for that machine so nobody picks it by habit. We’d advise against switching the whole shop on one weekend: a problem then shows up on every machine at once, with no proven post to fall back to.

Retire the old post

Retire the old post once the new one has passed one NX upgrade retest and a stretch of normal production without findings. Archive it with the baseline and the protocol, then remove it from the registration. That archive is the only answer to “what did this machine get before the switch?”


Doing It In-House or With Help

A team that knows NX CAM and NC code can migrate clean 3-axis posts itself once it has learned Post Configurator. Complex machines and posts nobody understands are where outside CAM engineers save the most time. A sensible split: the difficult post is built for you, and your team migrates the simpler ones with it as the template.

Two points before you plan it in-house. Post Configurator has license levels that decide which settings and custom code a user may change, so check what your seats allow. And Siemens lists its own instructor-led Post Configurator course as no longer offered, which is why we run NX Post Configurator training with an optional module on Post Builder migration, on your own posts.

At inteliScience, a Siemens NX, NXOpen and Teamcenter specialist delivering nearshore from Cluj-Napoca, Romania, posts are built and tested by our CAM engineers, not by AI: NC code that moves a machine needs an engineer who answers for it. When the migration is part of a larger NX upgrade or a CAM standard across several plants, our Siemens NX consulting looks at the whole setup first.


Frequently Asked Questions

How do you check that a converted NX postprocessor writes the same NC code as the original Post Builder post?

Post a fixed set of reference programs with the original Post Builder post before converting, post the same programs with the converted Post Configurator post, and compare the NC files line by line after removing block numbers and comments. The reference programs must cover every tool change, cycle, user-defined event and rotary function the shop uses. Each difference is then fixed or explained in writing, and the post is confirmed with a dry run and a test part on the machine.

Can the Siemens converter keep Post Builder custom commands when moving to Post Configurator?

Mostly, yes: Siemens describes its Post Builder to Post Configurator add-on as converting posts automatically while preserving existing customizations. Siemens’ own converter videos also show items that are excluded because they collide with the Post Configurator architecture, so every custom command needs a check. The reliable test is to post reference programs that use each custom command with both posts and compare the NC output line by line.

Should an NX postprocessor be converted automatically or rebuilt in Post Configurator?

Convert automatically when the Post Builder post is clean, documented and its custom commands are understood; rebuild in Post Configurator when the post is a patchwork of undocumented changes or drives a complex machine such as a mill-turn center or a 5-axis head. If Siemens Post Hub already has a post for the same machine and controller, starting from that post is often faster than either route. In every case, the old post’s NC output on a set of reference programs defines what the new post must produce.

How much does a Post Builder to Post Configurator migration cost per machine?

The cost of migrating an NX postprocessor depends on the machine type, the number of custom commands and user-defined events, whether the converter output is usable, and how much machine testing is needed; public prices for post migrations are rare. A clean 3-axis post that converts well is the cheapest case, mill-turn and linked posts the most expensive. At inteliScience, a new post for one 3-axis milling machine with one controller starts at €5,000, including a test part and a signed acceptance protocol, and migrations are quoted after a requirements questionnaire.

Can Post Builder and Post Configurator postprocessors run side by side in Siemens NX?

Yes. Both kinds of post run in the same NX postprocessing environment, so a converted post can be registered under its own name next to the original, and both stay selectable when a program is posted. Keep the old post frozen as a rollback, switch machine by machine after acceptance, and retire the old post once the new one has passed its first NX upgrade retest.


Next Step

If one of your machines runs on a Post Builder post that nobody wants to touch, start there. Send us the machine, the controller and the post. A CAM engineer tells you whether it converts cleanly, needs a rebuild or already exists in Post Hub, and what proving it on your machine involves.

Talk to a CAM engineer about your Post Builder posts


Cookie settings

Choose which services we may use on this website. Your choice is stored in your browser for 12 months. You can change it at any time via “Cookie settings” at the bottom of every page.

Strictly necessary

Stores your cookie choice. This cookie cannot be switched off.

Always active
Show cookies
NameProviderPurposeStorage period
is_cookie_consentinteliScienceStores your cookie choice and when you made it12 months

Google Analytics 4 measures page views, traffic sources and form use with a pseudonymous ID. Provider: Google Ireland Ltd. Data may also be processed by Google LLC in the USA (EU–US Data Privacy Framework).

Show cookies
NameProviderPurposeStorage period
_gaGoogleDistinguishes visitors with a pseudonymous ID2 years
_ga_<ID>GoogleStores the session state2 years

Google Ads measures which ads lead to enquiries (conversions) and lets us show our ads to previous visitors (remarketing). Provider: Google Ireland Ltd. Data may also be processed by Google LLC in the USA (EU–US Data Privacy Framework).

Show cookies
NameProviderPurposeStorage period
_gcl_au, _gcl_aw, _gcl_gsGoogleLinks ad clicks to enquiries90 days
_gcl_ls (local storage)GoogleLinks ad clicks to enquiries90 days
IDE (doubleclick.net)GoogleRemarketing and ad measurement13 months

Videos: YouTube videos only load when you press play (via youtube-nocookie.com). Only then does Google receive data.