Contacts
Get in touch
Close

Contacts

Romania, Cluj-Napoca – 400157
Str. Ploiești Nr. 9

Romania, Vama – 447350
Str. Fermei Nr. 14

+40 774 463 429

info@inteliscience.net

NX Postprocessor Requirements Questionnaire and Acceptance Test

Postprocessor Requirements: The Short Version

Postprocessor requirements are everything a CNC post must know that Siemens NX does not: kinematics, controller options, cycles, builder M codes, program format and the programs operators trust today. This free 30-page whitepaper by inteliScience turns them into a fillable questionnaire, an acceptance test with a signed protocol and an NX upgrade retest checklist.

FormatPDF, A4, 30 pages, printable forms with write-in fields and checkboxes
Contents85 numbered questions in seven parts, 12 acceptance criteria, 20 reference test cases, test record, acceptance protocol with signature fields, retest checklist
AudienceCAM leads, NC programmers, production leads, NX administrators
BalanceRoughly 80 percent practical templates, 20 percent inteliScience context
LanguagesEnglish, German, Romanian
PriceFree, no registration

Download the Whitepaper

Download: NX Postprocessor Requirements Questionnaire and Acceptance Test (English, PDF) Deutsch: NX-Postprozessor: Anforderungsfragebogen und Abnahmetest (PDF) · Română: Postprocesor NX: chestionar de cerințe și test de recepție (PDF)

Why Postprocessor Requirements Come Before the Post

A post that almost fits does not fail loudly. It writes NC code that runs most of the time, and the gap is closed by hand: an operator fixes the tool change block at the control, a programmer edits the output before every job, a cycle comes out as long-hand moves because nobody told the post it exists. Each of those fixes is a requirement that was never written down.

The controller name does not close that gap. Machine builders configure the same SINUMERIK or Fanuc control differently, with their own M codes, options and tool change sequences, and the enabled software options decide which functions a post may write at all.

We’d advise against ordering any post, from anyone, before these answers exist on paper. The questionnaire in this whitepaper is how we collect them, and it is written so you can hand it to Siemens, your reseller, another provider or your own CAM team just as well.

What the Questionnaire Asks

The questionnaire has seven parts, one per area a post has to get right. Every question has a write-in field or checkboxes, and every function you tick later becomes a test case.

Part What it asks Why it matters
A. Project and scopeJob type, NX release today and next, who signs, machine availabilityDecides who answers and who accepts
B. Machine and kinematicsBuilder, rotary axis arrangement, travel limits, pivot distances, tool changer, probing, coolantDrives the effort for 5-axis and mill-turn, and the simulation model
C. Controller and optionsSoftware version as displayed, enabled options, tilting and tool center point functions, decimal point inputDefines what the post may write
D. Cycles, tool change, motionController cycles or long-hand moves, preselect, same tool twice, reset sequence before tool changeEach answer becomes a reference test case
E. Program formatHeader, safe start block, program end, comments, file names, edits made at the control todayRemoves the hand edits operators make
F. Builder optionsM codes for clamping, coolant, pallets, probing, tool setter; user-defined eventsWhere the custom part of a post begins
G. Existing posts and documentsPost Builder or Post Configurator, custom commands, encrypted layers, trusted NC programs, documents to attachDefines the baseline for migrations

The Acceptance Test and the Signed Protocol

The second half of the whitepaper proves the finished post. You agree 12 acceptance criteria and a matrix of 20 reference test cases before the build, so “done” is defined before anyone writes a line. The test then runs in a fixed order: desk review of the posted code, comparison with the last accepted output, G-code-driven simulation where a machine model exists, program test on the control, air cut in single block, and a test part.

Our clear recommendation: never call a post accepted because one part came out right. The protocol in chapter 13 records the post version, NX release, controller software version and machine, with signature fields for your side and for whoever built the post, and it states that a change to any of them triggers a retest. Chapter 14 makes that retest a routine for the two NX releases Siemens ships each year, with a checklist and a signed addendum.

What the Whitepaper Covers

  1. How to Use This Whitepaper
  2. What Postprocessor Requirements Must Settle
  3. Questionnaire A: Project, Contacts and Scope
  4. Questionnaire B: Machine and Kinematics
  5. Questionnaire C: Controller, Options and Number Format
  6. Questionnaire D: Cycles, Tool Change and Motion
  7. Questionnaire E: Program Format and Output
  8. Questionnaire F: Special Functions and Machine Builder Options
  9. Questionnaire G: Existing Posts, NC Programs and Documents
  10. Acceptance Criteria and Reference Programs
  11. The Acceptance Test Procedure
  12. Acceptance Test Record
  13. Postprocessor Acceptance Protocol
  14. Retest Checklist After an NX Upgrade
  15. Working With inteliScience

Who It Is For

CAM leads who own the posts and get the call when a program behaves oddly. NC programmers who currently edit output before every job. Production leads who have to sign that a new post is safe on an expensive machine. NX administrators planning the move from Post Builder to Post Configurator, or the next NX upgrade. If you are about to buy a new 5-axis machine, fill in Part B and Part C before the machine arrives; that is when the builder’s documentation is easiest to get.

How to Use It

  1. Print chapters 3 to 9 and fill in one questionnaire per machine configuration, with your operator, setup and maintenance people in the room.
  2. Attach the documents from the checklist in chapter 9: controller manual, builder M-code list, option list, two or three trusted NC programs.
  3. Review the answers with whoever will build the post and agree the acceptance criteria and reference programs in chapter 10.
  4. Run the acceptance test on the machine, fill in the record in chapter 12 and sign the protocol in chapter 13.
  5. Keep everything next to the post files and work through chapter 14 before every NX rollout.

Sources and Method

The whitepaper uses official Siemens sources for Post Hub, Post Configurator, G-code-driven simulation and the NX for Manufacturing 2606 release, plus the Post Builder repository README for the end of Post Builder development. Library figures come from Siemens’ Post Hub milestone post of March 2023. The questionnaire and the test procedure come from the way our CAM engineers build and accept posts. No customer data, error rates or savings figures are included.

Read the Cluster Online


Frequently Asked Questions

What information does a postprocessor developer need to build a CNC post for Siemens NX CAM?

A postprocessor developer needs the machine’s kinematics and travel limits, the controller model with its software version and enabled options, the cycles, tool change sequence and machine builder M codes in use, the expected program format, and two or three NC programs the operators trust. The controller name alone is not enough, because machine builders configure the same controller differently. The inteliScience questionnaire collects these postprocessor requirements in 85 questions across seven parts, plus a list of documents to attach.

What should a CNC postprocessor acceptance test include?

A postprocessor acceptance test should include reference programs that cover every function in use, a block-by-block review of the posted code, a program test on the control, an air cut in single block, a test part and a protocol signed by both sides. Where a machine model exists, a G-code-driven simulation runs before the machine test. The protocol should name the post version, the NX release, the controller software version and the machine, so that any later change triggers a retest.

Which controller options must be known before a 5-axis postprocessor is built for SINUMERIK or Fanuc?

The options for tilted working planes and tool center point control must be confirmed first, because a post can only write functions the control has enabled. SINUMERIK controls use CYCLE800 and TRAORI for these jobs, Fanuc controls G68.2 and G43.4 or G43.5. Ask for the option list exported from the control, not the machine brochure.

How much does a custom NX CAM postprocessor cost in 2026?

The cost of a custom NX CAM postprocessor depends on the machine type, the controller, the number of cycles and builder functions, and whether machine simulation is included; many providers quote only on request. A 3-axis milling machine is the simplest case, while 5-axis heads, mill-turn and multi-channel machines take considerably more work. At inteliScience, a new post for one 3-axis milling machine with one controller starts at €5,000, including the requirements questionnaire, a test part on your machine and a signed acceptance protocol; larger machines are quoted after the questionnaire.

When does a CNC postprocessor need to be retested?

A CNC postprocessor needs a retest whenever something it depends on changes: a new CAM release, an edit to the post, a control software update or new option, a retrofit, or a new control generation on the same machine type. Siemens releases new NX versions twice a year, in June and December, so the retest works best as a routine: post the reference programs on the new release, compare them line by line with the last accepted output, and retest only the changed cases on the machine. Chapter 14 of the whitepaper is a checklist with a signature addendum for exactly that.


Next Step

Fill in the questionnaire for the machine whose post costs you the most today, or just send us the machine, the controller and what your operators change by hand. Our CAM engineers build one machine, one post from €5,000, accepted on your machine with a protocol both sides sign.

See NX postprocessor development: one machine, one post, from €5,000


Cookie settings

Choose which services we may use on this website. Your choice is stored in your browser for 12 months. You can change it at any time via “Cookie settings” at the bottom of every page.

Strictly necessary

Stores your cookie choice. This cookie cannot be switched off.

Always active
Show cookies
NameProviderPurposeStorage period
is_cookie_consentinteliScienceStores your cookie choice and when you made it12 months

Google Analytics 4 measures page views, traffic sources and form use with a pseudonymous ID. Provider: Google Ireland Ltd. Data may also be processed by Google LLC in the USA (EU–US Data Privacy Framework).

Show cookies
NameProviderPurposeStorage period
_gaGoogleDistinguishes visitors with a pseudonymous ID2 years
_ga_<ID>GoogleStores the session state2 years

Google Ads measures which ads lead to enquiries (conversions) and lets us show our ads to previous visitors (remarketing). Provider: Google Ireland Ltd. Data may also be processed by Google LLC in the USA (EU–US Data Privacy Framework).

Show cookies
NameProviderPurposeStorage period
_gcl_au, _gcl_aw, _gcl_gsGoogleLinks ad clicks to enquiries90 days
_gcl_ls (local storage)GoogleLinks ad clicks to enquiries90 days
IDE (doubleclick.net)GoogleRemarketing and ad measurement13 months

Videos: YouTube videos only load when you press play (via youtube-nocookie.com). Only then does Google receive data.