MBD Implementation: 5-Stage Roadmap From Drawings (2026)

MBD Implementation: The Short Version

MBD implementation makes the annotated 3D model, not the drawing, the released product definition. inteliScience, a Siemens NX engineering partner from Cluj-Napoca, runs it in five stages: readiness, standards, templates, a pilot part family and supplier rollout, with limited-dimension drawings as the bridge. NIST measured a 74.8% shorter design-to-inspection cycle for model-based test parts in 2016.

Stage Question it answers Deliverable Exit criterion
1. ReadinessWhere are we, and who downstream can read 3D PMI today?Maturity scores per area, consumer inventory, pilot scopeOne product line, a target level and a date agreed
2. StandardsWhat makes a dataset complete and valid?Company MBD standard on ASME Y14.41 or ISO 16792, authority rule, note textsStandard signed off by design, manufacturing and quality
3. TemplatesHow does every designer produce that dataset in NX?Part and drawing templates, model view set, PMI checksTemplates pass the checks on reference parts
4. Pilot part familyDoes it survive manufacture, inspection and a change?One family released as MBD plus limited-dimension drawings, measuredParts made and inspected from the model, one change released
5. Supplier rolloutCan each supplier consume the data?Supplier tiers, test package, contract clausePer supplier: first article from the model accepted, drawing retired

The Problem: MBD Implementation Stalls at “PMI on Some Parts”

Most NX organizations we talk to already have PMI on some models. What they lack is a decision about which artifact is the authority, a standard that says what a complete dataset contains, and suppliers who can read it. The result is a model with PMI and a hand-maintained drawing next to it: two truths, two revisions, two things to check.

The software is not the bottleneck. Siemens’ own guide to moving from drawing-based engineering to MBD in NX (February 2026) covers Convert To PMI for existing drawings, the MBD Navigator and Technical Data Package publishing as 3D PDF or JT+PDF. What breaks is the organization around it.

NIST put numbers on the stakes. In a 2016 study with three test cases, one full cycle of design annotation, manufacture and inspection averaged 60.3 hours drawing-based against 15.2 hours model-based, a 74.8% reduction. The largest single cause was mundane: the drawing-based supplier rebuilt the 3D model from the drawing, which alone took 52.5 hours in the first of the three test cases. A small study, but every DACH supply chain knows the mechanism.

Whether your contracts even allow a switch of master is a separate decision, covered in our comparison of MBD and 2D drawings in NX. This guide assumes that decision is made and answers the next question: in which order do you implement it?

Where You Start: MBD Maturity Levels From Drawing-Centric to Trusted MBD

Before any roadmap, place yourself on a maturity scale. The most complete public one is the NSE MBE Maturity Index (Brown, Hale and Winter, 2020). It extends the MBE Capability Index that the U.S. Department of Defense and NIST worked with at NIST’s 2016 Model-Based Enterprise Summit, and it defines seven levels. The first five describe MBD itself.

Level Name in the index What is authoritative Where the five stages take you
L0Drawing-Centric2D drawing only, disconnected from any modelRare in NX shops
L1Drawing Model-Centric2D drawing; drawings and STEP derived from 3D modelsWhere most NX organizations start
L2Validated Model-Centric2D drawing with a validated supporting 3D modelAfter stages 2 and 3
L3Formalized Model-Based DefinitionDrawing derived from the MBD (3D interactive viewable preferred), semantic PMI on the modelStage 4, with limited-dimension drawings
L4Trusted Model-Based DefinitionCertified and authorized MBD, drawing only as supportStage 5, supplier by supplier

Levels L5 and L6 (integrated and extended model-based enterprise) connect processes across the company and its partners; they are not where a first MBD implementation should aim.

Two details of the index help in practice. It scores the current state from three perspectives: capability (tools and standards), readiness (processes and procedures) and adoption (whether people actually work that way). And its authors warn that large corporations are often too heterogeneous to assess as a whole at first, so you define the organization under assessment: a site, a product line, one design team. We would go further. If the scope does not fit on one page, it is too big for a first MBD implementation. For a free starting point, the original DoD and NIST MBE Capability Index Assessment Tool, an Excel workbook, is still public on NIST’s GitHub (repository DT4SM, 46 stars on 9 October 2026).

The Five Stages of an MBD Implementation

Each stage ends with an artifact someone signs, not with a meeting. That is the difference between a roadmap and a slide.

Stage 1: Readiness, measured on your own parts

Readiness answers two questions: where are we on the scale above, per area (design, data management, manufacturing, quality), and who downstream can consume 3D PMI today? The second question decides more than the first. List every consumer of the drawing: CAM programmers, CMM programmers, incoming inspection, purchasing, each key supplier. For each one, note whether it reads semantic PMI, only views 3D, or needs a sheet.

Then look at the data, not the opinions. The journal below uses the general NXOpen Python API to count PMI objects, custom model views and drawing sheets for every part in a folder. Run it on two or three candidate part families and you know whether you start from rich PMI, from drawings that Convert To PMI can lift into the model, or from nothing.

# Stage 1 inventory: PMI objects, custom model views and drawing sheets per part.
# NXOpen Python, general API. Batch example:
#   run_journal pmi_inventory.py -args C:\mbd-pilot\parts C:\mbd-pilot\inventory.csv
import csv
import os
import sys

import NXOpen

# Default modeling views every part has; only additional views are counted.
STANDARD_VIEWS = {"TOP", "FRONT", "RIGHT", "BACK", "BOTTOM", "LEFT", "TFR-ISO", "TFR-TRI"}


def count(collection):
    return sum(1 for _ in collection)


def main(folder, out_csv):
    session = NXOpen.Session.GetSession()
    with open(out_csv, "w", newline="") as f:
        writer = csv.writer(f)
        writer.writerow(["part", "pmi_objects", "custom_model_views", "drawing_sheets"])
        for name in sorted(os.listdir(folder)):
            if not name.lower().endswith(".prt"):
                continue
            part, load_status = session.Parts.Open(os.path.join(folder, name))
            load_status.Dispose()
            custom_views = [v for v in part.ModelingViews if v.Name.upper() not in STANDARD_VIEWS]
            writer.writerow([
                name,
                count(part.PmiManager.Pmis),
                len(custom_views),
                count(part.DrawingSheets),
            ])
            part.Close(NXOpen.BasePart.CloseWholeTree.TrueValue,
                       NXOpen.BasePart.CloseModified.CloseModified, None)


if __name__ == "__main__":
    folder, out_csv = sys.argv[-2:]  # the two values passed after -args
    main(folder, out_csv)

In a master-model setup the drawing sheets live in separate drawing parts, so point the journal at those folders as well. For Teamcenter-managed data, export the candidate family to a native folder first or adapt the open call.

Stage 2: Standards, written down as your own MBD standard

The standards stage produces one document: your company MBD standard. It names the base standard, says which artifact is authoritative, lists what a complete dataset contains, and fixes the wording of the notes. Without it, every template and every check in stage 3 encodes somebody’s personal preference.

Pick the base standard by the GD&T system you already use, not by fashion. If your drawings follow ISO GPS, ISO 16792:2021 is the natural base. It supports two methods, model only and model with a 2D drawing in digital format, and a fourth edition is in draft as ISO/DIS 16792. If you work to ASME Y14.5, use ASME Y14.41, whose current edition, ASME Y14.41-2026, was published on 30 June 2026. How the two differ, clause by clause, is in our guide to ASME Y14.41 vs ISO 16792 for your MBD standard. A customer contract can override both.

The dataset content list is where most of the real work sits:

  1. Geometry: the solid, released at one revision, with units and tolerancing defaults stated.
  2. Semantic PMI: datums, feature control frames and toleranced dimensions, bound to the features they control.
  3. Model views: a fixed, named set; ASME Y14.47-2023 gives a framework for organizing the model.
  4. Notes and attributes: material, finish, general tolerance, revision and the authority note.
  5. Derived outputs: which format goes to which consumer (STEP AP242, JT, 3D PDF) and the rule for limited-dimension drawings.

Our clear recommendation: write the authority rule as one sentence and put it into the standard before anyone builds a template. “The 3D model is the authority for all geometry not dimensioned on the drawing” is a sentence a supplier can sign. “MBD where possible” is not.

Stage 3: Templates and checks in Siemens NX

Templates turn the standard into the default. In NX, the part template carries the PMI standard, units and text settings, the named model view set and the attributes the title block reads. A separate drawing template holds the limited-dimension layout with the authority note built in. PMI checks in Check-Mate close the loop, so a missing datum or an unbound tolerance fails before release instead of at the supplier.

Legacy parts need a path too. Convert To PMI lifts existing drafting annotations into the model, and the MBD Navigator shows what landed in which view. Treat converted PMI as a draft: a check run and an engineer’s review decide whether it is semantic and complete.

Rules and templates pay off at scale. In our PMI authoring automation project for more than 300 design engineers at a European automotive OEM, the client reports that manual PMI authoring previously took about 40 percent longer than authoring to the automated rule set. That project also crossed two NX version changes (NX 2412 to NX 2512), which is why templates and checks belong under version control from day one. AI-assisted PMI suggestions can speed authoring up later, on top of the rules, never instead of them.

Stage 4: A pilot part family, through one full change

Pick one part family that one design team owns, with tolerances that matter for function, made in house or by one supplier that already programs from 3D. Avoid the most safety-critical parts and any family that is about to be redesigned.

The pilot is not done when the models are annotated. It is done when parts were manufactured and inspected from the model, and when at least one engineering change went through: model revised, limited-dimension drawing regenerated, both released together, supplier informed. Revision handling is where half-implemented MBD breaks, and a pilot without a change has not tested it.

Measure along the lines of the NIST study, on your own parts: supplier questions per part, hours spent rebuilding models from drawings, CMM programming time and change turnaround. Record the drawing-based baseline before you start, or the comparison at the end is opinion.

Freeze the NX release for the pilot. Designcenter 2606, released on 23 June 2026, is the current version, and Siemens ran the early access program for Designcenter 2612 between 31 August and 25 September 2026. Upgrade between stages, not in the middle of one.

A pilot proves MBD on one part family. What’s missing for production: a company MBD standard everyone works to, NX templates and checks on every seat, a release rule in Teamcenter, and suppliers who can read the data. Our fixed-price MBD Readiness Assessment (€4,900, one week, five of your sample parts) ends with a gap list against ISO 16792 or ASME Y14.41, a supplier data package check and a transition roadmap: see what the MBD Readiness Assessment covers.

Stage 5: Supplier rollout, one supplier at a time

Suppliers do not move as a block, so do not plan as if they would. Sort them by what they can consume, and give each tier its own package and its own exit.

Supplier capability What you send Drawing status
CAM and CMM read semantic PMISTEP AP242 with semantic PMI, plus native data where agreedRetired after an accepted first article from the model
Views 3D, programs from 2D3D PDF or JT+PDF Technical Data Package plus the limited-dimension drawingStays until their CAM or CMM reads the model
Drawing onlyLimited-dimension drawing plus the 3D model as referenceA date for model-based delivery goes into the next framework agreement

Test before you ship production data. Have each supplier import a known test file first: the NIST CAD models with PMI ship as AP242 files with NIST’s free STEP File Analyzer and Viewer (SFA). Then check your own exports the same way. SFA reports semantic PMI, graphic PMI and validation properties against the CAx-IF recommended practices. Version 5.50 (20 August 2026) updated its AP242 schema and added AP242 XML files with assembly structure to the viewer; version 5.51 followed on 14 September 2026. The SFA repository had 198 GitHub stars on 9 October 2026. Its command-line version runs over a whole folder of exports:

:: Stage 5: check every AP242 export of the pilot family with NIST SFA 5.51.
:: Run from a Command Prompt in the folder that holds sfa-cl.exe.
:: One spreadsheet per STEP file; noopen keeps Excel from opening each result.
for %f in (C:\mbd-pilot\step\*.stp) do sfa-cl.exe "%f" noopen

A semantic PMI report that is empty or full of errors is a finding for you, not for the supplier. Fix the export before the first supplier sees it.

Put the contract last, but do not skip it. Each supplier’s exit gets a date in the framework agreement. Without a date, the limited-dimension drawing quietly becomes permanent.

Limited-Dimension Drawings: The Bridge During the Transition

A limited-dimension drawing (also called a reduced-dimension drawing) keeps only the critical information on the sheet and states that everything else comes from the 3D model. It lets you run MBD internally while procedures, suppliers and incoming inspection still expect paper. ASME Y14.41 and ISO 16792 both provide for a model-with-drawing method, so this is not a workaround outside the standards.

What stays on the sheet

The title block with part number and revision, the datum reference frame, the characteristics that are inspected or critical to function, material, finish, the general tolerance and the authority note. Nominal dimensions of non-critical features stay in the model. The note has to be unambiguous. A wording we use as a starting point, to be adapted to your standard and checked by whoever signs your contracts:

DIMENSIONS NOT SHOWN ARE DEFINED BY THE 3D MODEL <PART NUMBER> REV <X>.
THE MODEL IS THE AUTHORITY FOR ALL GEOMETRY NOT DIMENSIONED ON THIS DRAWING.
MODEL AND DRAWING ARE RELEASED TOGETHER UNDER THE SAME REVISION.

How to build them in NX without double maintenance

Derive the sheet from the model, and never dimension by hand what PMI already defines. NX drafting can inherit PMI from the model into drawing views, and the view’s PMI settings let you exclude PMI types, so the sheet shows the critical characteristics and nothing else. Release model and drawing together in Teamcenter under one revision, so a change to one forces a look at the other.

We advise against limited-dimension drawings with manually added dimensions “just this once”. Every hand-placed dimension is a second truth, and the first change after release will make it wrong.

When to retire them

Per supplier, not per calendar. A drawing for a given part and supplier is retired when that supplier has produced and inspected a first article from the model and the result was accepted. Set a company-wide target date if it helps the project; retire individual drawings only on evidence.

What an MBD Implementation Costs and How Long It Takes

There is no public price list for MBD implementation, and anyone who quotes your savings as a percentage before seeing your parts is guessing. What can be named are the cost drivers, and most of them are people, not licenses.

Cost driver What it covers Note
LicensesPMI and Technical Data Package capabilities in your NX package, viewers for consumersSiemens or reseller quote; check what your current package already includes
StandardsASME Y14.41-2026 or ISO 16792, plus your GD&T base standardOne-time; ASME lists Y14.41 at 230 to 300 US dollars depending on format
Company MBD standardWriting, review, sign-off by design, manufacturing and qualityMostly internal time
Templates and checksNX templates, model view set, Check-Mate PMI checks, version controlEngineering days, maintained with every NX release
TrainingPMI authoring for designers, reading 3D for shop floor and inspectionPer role, not per seat
Pilot and supplier onboardingTest packages, first articles, export fixes, contract clausesGrows with the number of suppliers

On time, plan in NX release cycles rather than in months. Siemens ships two major releases a year, in June and December, and each stage should finish inside one cycle with the release frozen. Readiness and standards can share the first cycle; the pilot needs its own, because it has to include a change. Supplier rollout takes as long as your slowest important supplier needs.

Before You Scale Beyond the Pilot: A Checklist

  1. The authority rule is one sentence in a signed company MBD standard.
  2. Every NX seat creates new parts from the MBD templates, and the templates are under version control.
  3. PMI checks run before release, and every rule has an owner.
  4. Model and limited-dimension drawing are released together under one revision in Teamcenter.
  5. The pilot family went through at least one engineering change end to end.
  6. Your own AP242 exports pass an SFA check before any supplier receives them.
  7. Every supplier has a tier, a package and a date.

If you cannot tick items 1, 4 and 5, scaling multiplies the problem instead of the benefit.

Frequently Asked Questions

What are the stages of an MBD implementation?

A practical MBD implementation runs in five stages: a readiness assessment, a company MBD standard, NX templates and checks, a pilot part family and a supplier rollout. Maturity models such as the NSE MBE Maturity Index describe the same path as levels, from drawing-centric (L0) to trusted model-based definition (L4). The order matters more than the speed: templates without a standard and suppliers without a pilot are the two shortcuts we see fail most often.

What is a limited-dimension drawing in model-based definition?

A limited-dimension drawing, also called a reduced-dimension drawing, is a 2D drawing that shows only critical information and states that all other geometry is defined by the associated 3D model. Companies use it during the transition to MBD so that procedures and suppliers that still need a sheet keep working. It should be derived from the model and released with it, never dimensioned by hand.

Do suppliers need Siemens NX to manufacture from an MBD dataset?

No. Suppliers whose CAM and CMM software reads it can work from STEP AP242 with semantic PMI, and suppliers without a CAD system can use a 3D PDF or JT+PDF technical data package together with a limited-dimension drawing. What a supplier needs is software that consumes the format you send, which is why a test file should always come before production data.

How much does MBD implementation cost for a manufacturer using Siemens NX?

There is no public benchmark price, because the cost depends on the number of part families, NX seats and suppliers, and above all on internal engineering time for the standard, templates, training and supplier onboarding. Licenses and standards are the smaller items; ASME Y14.41-2026, for example, lists at 230 to 300 US dollars. To size it on your own data, inteliScience offers a fixed-price MBD Readiness Assessment for €4,900 on five sample parts, in one week, ending with a gap list, a readiness score and a transition roadmap.

ASME Y14.41 vs ISO 16792: which standard should an MBD implementation follow?

Follow the standard that matches your GD&T system and your customers: ISO 16792 if your drawings use ISO GPS, ASME Y14.41 if you work to ASME Y14.5. Both set requirements for digital product definition data, and both allow a model-only method and a model-with-drawing method. The current ASME Y14.41 edition dates from 2026, while ISO 16792:2021 is being revised as a draft fourth edition.


Next Step

Bring five parts and your hardest supplier. In a free 60-minute strategy call, inteliScience’s Siemens NX engineers from Cluj-Napoca look at where your MBD implementation stands, which part family fits a pilot and what your suppliers will need, so the roadmap starts from your data, not from a template. Book a strategy call about your MBD implementation



References

  • Hedberg, Lubell, Fischer, Maggiano, Barnard Feeney, “Testing the Digital Thread in Support of Model-Based Manufacturing and Inspection”, ASME Journal of Computing and Information Science in Engineering 16(2), 8 March 2016 (NIST publication): https://www.nist.gov/publications/testing-digital-thread-support-model-based-manufacturing-and-inspection (retrieved 9 October 2026)
  • Brown, Hale, Winter, “A Next-Generation Model-Based Enterprise Maturity Index” (NSE MBE Maturity Index, 7 February 2020): https://www.sandia.gov/app/uploads/sites/171/2022/03/2020_MBE_Summit_NSE_MBE_Maturity_Index_Paper.pdf (retrieved 9 October 2026)
  • NIST and U.S. Department of Defense, MBE Capability Index Assessment Tool (GitHub usnistgov/DT4SM): https://github.com/usnistgov/DT4SM/tree/master/MBE-Capabilities-Assessment (retrieved 9 October 2026)
  • Siemens Designcenter blog, Michael Hobson, “NX: How to move from drawing-based engineering to MBD” (12 February 2026): https://blogs.sw.siemens.com/designcenter/designcenter-nx-how-to-move-from-drawing-based-engineering-to-mbd/ (retrieved 9 October 2026)
  • Siemens Designcenter blog, Jamie Tyler, “Designcenter is for everyone, June 2026 release” (23 June 2026): https://blogs.sw.siemens.com/designcenter/designcenter-is-for-everyone-june-2026-release/ (retrieved 9 October 2026)
  • Siemens, “Welcome to the September 2026 Early Access Program for Designcenter” (Designcenter 2612): https://resources.sw.siemens.com/pl-PL/presentation-welcome-to-designcenter-early-access-program/ (retrieved 9 October 2026)
  • ASME, “Y14.41 Digital Product Definition Data Practices” (current edition 2026): https://www.asme.org/codes-standards/find-codes-standards/y14-41-digital-product-definition-data-practices (retrieved 9 October 2026)
  • ASME, “Y14.47 Model Organization Practices” (2023 edition, issued 6 June 2023): https://www.asme.org/codes-standards/find-codes-standards/y1447-2019-model-organization-practices (retrieved 9 October 2026)
  • ISO 16792:2021, “Technical product documentation, Digital product definition data practices”: https://www.iso.org/standard/73871.html, and draft successor ISO/DIS 16792: https://www.iso.org/standard/83352.html (retrieved 9 October 2026)
  • NIST, STEP File Analyzer and Viewer (SFA), GitHub repository with release notes for versions 5.50 and 5.51: https://github.com/usnistgov/SFA (retrieved 9 October 2026)

Cookie settings

Choose which services we may use on this website. Your choice is stored in your browser for 12 months. You can change it at any time via “Cookie settings” at the bottom of every page.

Strictly necessary

Stores your cookie choice. This cookie cannot be switched off.

Always active
Show cookies
NameProviderPurposeStorage period
is_cookie_consentinteliScienceStores your cookie choice and when you made it12 months

Google Analytics 4 measures page views, traffic sources and form use with a pseudonymous ID. Provider: Google Ireland Ltd. Data may also be processed by Google LLC in the USA (EU–US Data Privacy Framework).

Show cookies
NameProviderPurposeStorage period
_gaGoogleDistinguishes visitors with a pseudonymous ID2 years
_ga_<ID>GoogleStores the session state2 years

Google Ads measures which ads lead to enquiries (conversions) and lets us show our ads to previous visitors (remarketing). Provider: Google Ireland Ltd. Data may also be processed by Google LLC in the USA (EU–US Data Privacy Framework).

Show cookies
NameProviderPurposeStorage period
_gcl_au, _gcl_aw, _gcl_gsGoogleLinks ad clicks to enquiries90 days
_gcl_ls (local storage)GoogleLinks ad clicks to enquiries90 days
IDE (doubleclick.net)GoogleRemarketing and ad measurement13 months

Videos: YouTube videos only load when you press play (via youtube-nocookie.com). Only then does Google receive data.