Convert 2D Drawings to MBD: The Short Version
To convert 2D drawings to MBD, you move every dimension, tolerance, GD&T frame and note from the sheet onto the faces of the 3D model as semantic PMI, then prove nothing was lost. inteliScience, a Siemens NX engineering partner from Cluj-Napoca, triages the drawings first, transfers them rule-based or AI-assisted, and checks completeness against the sheet.
| Method | What it does | Where it fits | Where it stops |
|---|---|---|---|
| Manual re-dimensioning in NX PMI | An engineer recreates each dimension as PMI on the model | A handful of critical parts | Slow, typing errors, no proof of completeness |
| NX Convert To PMI | Converts drafting annotations to PMI, by drawing, sheet, view or single dimension | Drawings built in NX against the model | Manually edited, approximate, retained and non-associative annotations, tables |
| Rule- or template-based (NXOpen) | Scripts map drafting objects to PMI by company rules | Large, uniform drawing families | Irregular legacy sheets that break the rules |
| AI-assisted transfer with completeness check | Reads the sheet, creates PMI on model faces, checks the result against the sheet | Mixed legacy backlogs, both directions | Needs a deterministic check and an engineer’s release |
The Problem: Thousands of Drawings, and a Model That Knows None of It
Most companies that decide on MBD do not start from zero. They start from a drawing archive. A NIST literature review from August 2019, using survey data from Lifecycle Insights, found that 38.2% of respondents released all of their designs with 2D drawings and another 30.1% released most of them (76 to 99%). Only 26.8% released at least half of their designs as 3D models with embedded PMI.
So the first pain is volume. Every active part has a sheet with dimensions, fits, tolerances, datums and notes, and the 3D model behind it carries none of that as data. Re-dimensioning each model by hand in NX PMI is tedious work, and it fails in the most expensive way: quietly. A tolerance typed as 0/-0.01 instead of 0/-0.1 looks fine on screen and only shows up at the supplier.
The second pain is the opposite direction. Many companies already author PMI, but suppliers, purchasing and the shop floor still ask for a sheet. Maintaining a hand-made drawing next to the PMI means two truths and two revisions. The stakes are measurable: in NIST’s 2016 digital thread study, one cycle of design, manufacture and inspection averaged 60.3 hours drawing-based against 15.2 hours model-based, and rebuilding the 3D model from the drawing at the supplier alone took 52.5 hours in the first test case.
What both pains have in common: the sheet and the model must say exactly the same thing, and someone has to prove it. Whether MBD should be your master at all is a separate decision, covered in our comparison of MBD and 2D drawings in NX. This guide assumes you have decided and now face the archive.
Four Ways to Convert 2D Drawings to MBD
There are four practical methods, and most backlogs need more than one. Native NX conversion is the right first step for clean, associative NX drawings; rules cover uniform families; AI-assisted transfer handles the irregular rest. Manual re-dimensioning stays the fallback for the few parts nobody wants to automate.
Manual re-dimensioning. An engineer opens the model, creates each dimension in PMI and types the tolerance from the sheet. It works for ten parts. For a thousand it becomes a project nobody finishes, and nothing in the process proves that every value arrived.
NX Convert To PMI. Siemens’ own guide to moving from drawing-based engineering to MBD (February 2026) describes Convert To PMI for drawings associated with an NX part file: you choose all drawings, single sheets, single views or individual dimensions. In a master-model setup, the option to create the PMI in the master model part has to be on, or the PMI lands in the drawing file instead of the model. What converted is listed in the model’s part properties.
The limits are documented too. The NX help lists objects with no PMI equivalent: approximate, projected and manually edited dimensions, retained annotations, dimensions on splines projected as arcs, parts lists, hole tables, bend tables, sheet zone annotations and several symbol types. Legacy drawings are full of exactly those: dimensions overwritten by hand years ago, views that lost their associativity after a remodel.
Rule- or template-based conversion. An NXOpen program maps drafting objects to PMI by your rules: which dimension types become which PMI, which annotation plane, which model view. It pays off for a family of a few hundred similar drawings from one era and one template. It breaks on the sheet that someone drew differently in 2011.
AI-assisted transfer with a completeness check. An assistant reads the sheet the way an engineer does (value, tolerance, prefix, view, and the faces behind each dimension), creates PMI on the model and then compares the result with the sheet. The AI is not the guarantee here. The check is.
Our recommendation: run Convert To PMI first wherever it works, and treat its output as a draft, not as released PMI. A conversion that succeeded technically can still be semantically wrong, for example a diameter attached to an edge instead of a cylindrical face.
Which Drawings to Convert First, and What Drives the Effort
Do not convert the archive. Convert the parts that will be made, changed or quoted again, and let the rest stay on paper until someone touches them. In practice that is a fraction of the archive, and it is the part where MBD pays back.
A triage that works for most NX organizations, in this order:
- Active parts in current products, especially those going to suppliers that already program CAM or CMM from 3D.
- Parts with an open or planned engineering change. Convert them as part of the change, so the revision that carries PMI is the one that gets released.
- Part families that share one drawing template. Uniform sheets convert well by rule and give you a clean reference set.
- Drawings that are still associative to an NX master model. They are the cheapest to convert.
- Everything else on touch: when a legacy part is ordered, revised or quoted, it gets converted then.
Leave out obsolete parts, standard parts and purchased components. For parts that have no 3D model at all, converting the drawing to MBD is the second step; the first is building the model.
Effort drivers
There is no fair price per drawing before someone has seen your sheets. What decides the effort:
| Driver | Lower effort | Higher effort |
|---|---|---|
| Associativity | NX drawings on a master model | Imported, non-associative or hand-edited dimensions |
| Uniformity | One template, one era | Decades of templates and drafting styles |
| Annotation scope | Dimensions, tolerances, notes | Plus GD&T, datums, surface finish, weld symbols |
| Standard | One base standard (ISO or ASME) | Mixed standards, customer-specific rules |
| Outputs | PMI in the model only | Plus model views, layers, 3D PDF, limited-dimension drawing |
| Review capacity | An engineer releases each part in minutes | No owner for the release step |
What Must Transfer, and What Does Not Map 1:1
Everything the sheet defines must reach the model: dimensions with their tolerances, fits, GD&T frames, datums, notes and the views that organize them. Most of it maps directly to NX PMI. The part that does not map is where conversions fail, so plan for it before the first run.
| Sheet content | In NX PMI | Watch out for |
|---|---|---|
| Dimensions and tolerances | PMI dimensions on model faces, with the same tolerance | Dimensions whose value was overwritten by hand |
| Fits (for example N7) | Limit-and-fit tolerance on the PMI dimension | Envelope requirement and fit display per your standard |
| GD&T frames | Feature control frames on faces | Datum references must exist first |
| Datums | Datum feature symbols | Datum targets and their conditions |
| General notes | PMI notes, often in a separate model view | Material, edge breaks, general tolerances belong in notes, not dimensions |
| Views and sections | Model views, PMI section views | Revolved or folded sections have no direct equivalent |
| Title block, parts list, tables | Part attributes, not PMI | Tables do not convert to PMI at all |
The subtle case is a value without a face. NX PMI attaches to model geometry: a dimension needs faces or edges it can measure. A drawing, on the other hand, can dimension anything the drafter could draw, such as the diameter of a ridge that is only an intersection edge, or an angle between a cone and a neighbouring face. When NX has no face pair to measure, the honest transfer is a PMI note on the face that carries the sheet’s text, and a line in the report that says so. Silently dropping it is the worst outcome. Silently inventing a dimension is the second worst.
Two standards frame the result. ASME Y14.41 (current edition ASME Y14.41-2026, issued 30 June 2026) and ISO 16792:2021 both define digital product definition data practices, and both allow a model-only method and a model with a 2D drawing. Choose by the GD&T system your drawings already use: ISO 16792 for ISO GPS, ASME Y14.41 for ASME Y14.5. The differences that change your PMI settings are in our guide to ASME Y14.41 vs ISO 16792 for MBD.
How to Verify Completeness Against the Sheet
A conversion is finished when you can show, part by part, that the model carries every value the sheet had and nothing extra. A visual comparison by an engineer is not that proof. A deterministic check is: count and compare, value by value, and report every difference.
The journal below uses the general NXOpen Python API for a first pass in a master-model setup. It compares the dimension values on the drawing with the PMI dimensions on the model and lists what is missing or extra. A full check also pairs each value with its tolerance and its faces, and compares notes by text; this sketch shows the principle.
# First-pass completeness check after a drawing-to-PMI transfer (master model).
# NXOpen Python, general API. Usage:
# run_journal pmi_completeness.py -args C:\mbd\part.prt C:\mbd\part_dwg.prt
import sys
from collections import Counter
import NXOpen
import NXOpen.Annotations
def value_key(dim):
# Round so 15.0 and 14.9999999 count as the same nominal value.
return round(dim.ComputedSize, 3)
def main(model_path, drawing_path):
session = NXOpen.Session.GetSession()
lw = session.ListingWindow
lw.Open()
# Open the model first, then the drawing that references it.
model, status = session.Parts.Open(model_path)
status.Dispose()
drawing, status = session.Parts.Open(drawing_path)
status.Dispose()
sheet = Counter(value_key(d) for d in drawing.Dimensions)
pmi, other_pmi = Counter(), 0
for item in model.PmiManager.Pmis:
shown = item.GetDisplayInstances()
if shown and isinstance(shown[0], NXOpen.Annotations.Dimension):
pmi[value_key(shown[0])] += 1
else:
other_pmi += 1 # notes, symbols, GD&T: compared separately
missing = sheet - pmi
extra = pmi - sheet
lw.WriteLine(f"Sheet dimensions: {sum(sheet.values())}, PMI dimensions: {sum(pmi.values())}")
lw.WriteLine(f"Other PMI objects (notes, symbols): {other_pmi}")
for value, n in sorted(missing.items()):
lw.WriteLine(f"MISSING on model: {value} (x{n})")
for value, n in sorted(extra.items()):
lw.WriteLine(f"EXTRA on model: {value} (x{n})")
if not missing and not extra:
lw.WriteLine("Dimension values complete: nothing missing, nothing extra.")
if __name__ == "__main__":
main(*sys.argv[-2:])
Three rules make the check worth its name. First, the sheet value is the guard: if a PMI measures a different value than the sheet states, the PMI is wrong or the model and drawing disagree, and either way it goes back to an engineer instead of into the release. Second, every value the transfer could not place as a dimension appears in the report as a note, by name. Third, the check runs again after every engineering change.
Then test what leaves the building. Export the converted part to STEP AP242 and open it with NIST’s free STEP File Analyzer and Viewer (SFA), which reports semantic PMI against the CAx-IF recommended practices; version 5.51 was released on 14 September 2026, and the SFA repository had 200 GitHub stars on 4 November 2026. Which formats suppliers can actually read is covered in our guide to the MBD supplier data package.
Use Case: A Legacy Drawing Becomes PMI in One Click
This is a simple demo, recorded in November 2026 with Vision4NX, the AI assistant for Siemens NX developed by inteliScience. The part is an idler pulley with a master-model drawing. One click starts the transfer; everything below happened in that one run.
The video is loaded from YouTube when you play it. Watch on YouTube
What the run did:
- 13 of 13 dimensions and 4 of 4 notes from the sheet became PMI on the model faces, with their tolerances, including Ø15 N7 Ⓔ and 15 0/-0.1.
- The sheet value was the guard for every PMI: a PMI that measures something else than the sheet states does not stay.
- Three model views organize the result: PMI_ALL, a PMI section view SECTION A-A for the inner dimensions, and NOTES for the general notes.
- The completeness check compared the model with the drawing: nothing missing, no extra PMI.
- Two values had no face to measure. The ridge Ø30 and the 15° cone angles became PMI notes, because NX has no face pair to dimension them, and the report says so.
- A 3D PDF came out of NX’s own Publish Technical Data Package command with NX’s native template.
What it did not do, and why. GD&T frames and datums were left out on purpose in this run; the scope was dimensions, tolerances and notes. And on this small part, some annotations still sit close together after the automatic layout, which an engineer would tidy up before release.
That is the honest size of a demo. In a customer project everything in it is configurable to your standard: the annotation scope (GD&T, datums, surface finish), which model views and layers are created, the placement rules, your NX templates and title blocks, and the 3D PDF template, either your own or one the AI creates for you. The same mechanism also runs the other way, from PMI to a 2D drawing. How AI-assisted PMI authoring behaved on our own MBD guideline before this demo is in our report on AI-generated PMI in Siemens NX.
This demo converts one simple part. What’s missing for production: your drawing standard and GD&T scope, your templates and title blocks, batch runs over the backlog, a review step with a named owner, and STEP checks before anything reaches a supplier. We set that up on your drawings: see how we turn 2D drawings into PMI in your NX.
Running 2D and 3D in Parallel Without Double Maintenance
You can keep 2D drawings after the move to MBD, and most companies should for a while. The rule is that the drawing is derived from the PMI, never maintained next to it. Then there is one truth, and the sheet is a view of it.
The standard tool for this is the limited-dimension drawing (also called a reduced-dimension drawing). It keeps the title block, the datum reference frame, the critical and inspected characteristics, material, finish, the general tolerance and a note that the 3D model defines everything else. Our MBD implementation roadmap covers when to retire it, supplier by supplier.
In NX, drafting views inherit PMI from the model views. The Inherit PMI setting of each view decides which PMI arrives, and the PMI types filter keeps the sheet to the critical characteristics. New or changed PMI marks the drawing out of date, and the next update brings it in. Step by step, with the view settings, it is in our NX PMI tutorial.
We advise against adding dimensions to such a drawing by hand, “just this once”. Every hand-placed dimension is a second truth, and the first change after release makes it wrong.
The reverse direction is already in production use. In our MBD and 2D drawings case study, a mid-sized DACH machine builder with 50 users authors PMI once as the MBD master, and Vision4NX derives the 2D drawing from it, interactively and in batch runs. Converting legacy drawings into PMI is the step before: it gives the archive the PMI that the derivation then feeds on.
Two timing details for NX shops. Designcenter NX 2606 was released on 23 June 2026, and Siemens ran the early access program for Designcenter 2612 between 31 August and 25 September 2026. Freeze one release for a conversion campaign, and run the completeness check again after each upgrade.
Frequently Asked Questions
Can Siemens NX convert 2D drawing dimensions into PMI automatically?
Yes, for drawings created in NX against the model. The Convert To PMI command turns drafting dimensions, GD&T and notes into PMI, for all drawings, single sheets, views or individual dimensions; in a master-model setup the PMI has to be created in the master model part. The output is a draft: an engineer or a completeness check still has to confirm that every value landed on the right faces.
Which drafting annotations cannot be converted to PMI in Siemens NX?
According to the NX help, objects without a PMI equivalent do not convert, among them approximate, projected and manually edited dimensions, retained annotations, parts lists, hole tables, bend tables, sheet zone annotations and several symbol types. In legacy drawings, hand-overwritten dimension values and views that lost associativity are the most common blockers. Values that NX cannot measure on a face are best carried over as PMI notes and reported, not dropped.
AI-assisted drawing conversion vs NX Convert To PMI: what is the difference?
NX Convert To PMI converts drafting objects that are associative to the model and have a PMI equivalent; it does not interpret the sheet. AI-assisted conversion reads the drawing like an engineer (values, tolerances, views and the faces behind them), so it can also handle irregular legacy sheets, and it needs a deterministic completeness check to be trusted. In practice the two complement each other: native conversion where it works, AI-assisted transfer for the rest.
How much effort does it take to convert legacy 2D drawings to MBD?
It depends less on the number of drawings than on their state: associative NX drawings on one template are quick, while imported, hand-edited drawings from many eras take longer. The annotation scope (GD&T, datums, surface finish), your standard, the required outputs such as model views and 3D PDF, and the review capacity drive the rest. A triage that converts only active and changing parts usually cuts the volume far more than any tool does.
Do ASME Y14.41 and ISO 16792 allow a 2D drawing alongside the MBD model?
Yes. Both ASME Y14.41 (current edition 2026) and ISO 16792:2021 provide for a model-only method and a model with a 2D drawing, so a limited-dimension drawing is within the standards. The drawing should be derived from the model’s PMI and released together with it under one revision, never dimensioned separately by hand.
Next Step
Bring ten of your legacy drawings. In a free 60-minute strategy call, inteliScience’s Siemens NX engineers from Cluj-Napoca look at your drawing archive, sort which drawings to convert first and show what a completeness check would report on your parts. Book a strategy call about your drawing backlog
Related Topics
- Turning 2D drawings into PMI in Siemens NX
- Where PMI ends and MBD begins
- Data packages for suppliers without NX
References
- Douglas Thomas, “The Model Based Enterprise: A Literature Review of Costs and Benefits for Discrete Manufacturing”, NIST Advanced Manufacturing Series 100-26, August 2019, section 3.2 and Table 3-1 (survey data: Lifecycle Insights): https://doi.org/10.6028/NIST.AMS.100-26 (retrieved 4 November 2026)
- Hedberg, Lubell, Fischer, Maggiano, Barnard Feeney, “Testing the Digital Thread in Support of Model-Based Manufacturing and Inspection”, ASME Journal of Computing and Information Science in Engineering 16(2), March 2016 (NIST publication): https://www.nist.gov/publications/testing-digital-thread-support-model-based-manufacturing-and-inspection (retrieved 4 November 2026)
- Siemens Designcenter blog, Michael Hobson, “Designcenter NX | How to | Moving from drawing-based engineering to model-based definition” (12 February 2026): https://blogs.sw.siemens.com/designcenter/designcenter-nx-how-to-move-from-drawing-based-engineering-to-mbd/ (retrieved 4 November 2026)
- Siemens Support Center, “Convert to PMI creates PMI in specification part instead of UGMaster” (PL8004230): https://support.sw.siemens.com/en-US/okba/PL8004230/Convert-to-PMI-creates-PMI-in-specification-part-instead-of-UGMaster/index.html, and “After converting PMI, the Convert Drawing Item tab is not showing” (PL8010977): https://support.sw.siemens.com/en-US/okba/PL8010977/After-converting-PMI,-the-Convert-Drawing-Item-tab-is-not-showing/index.html (retrieved 4 November 2026)
- Siemens NX help, PMI: “Conversion limitations for drafting dimensions and annotations” and “Operating characteristics of inherited PMI”: https://docs.sw.siemens.com/documentation/external/PL20221117716122093/en-US/nx_help/nx/2306/nx_help/en-US/pmi/index.html (retrieved 4 November 2026)
- ASME, “Y14.41 Digital Product Definition Data Practices” (current edition 2026): https://www.asme.org/codes-standards/find-codes-standards/y14-41-digital-product-definition-data-practices (retrieved 4 November 2026)
- ISO 16792:2021, “Technical product documentation, Digital product definition data practices”: https://www.iso.org/standard/73871.html (retrieved 4 November 2026)
- NIST, STEP File Analyzer and Viewer (SFA), GitHub repository and release notes: https://github.com/usnistgov/SFA (retrieved 4 November 2026)
- Siemens Designcenter blog, “Designcenter is for everyone, June 2026 release” (23 June 2026): https://blogs.sw.siemens.com/designcenter/designcenter-is-for-everyone-june-2026-release/ (retrieved 4 November 2026)
- Siemens, “Welcome to the September 2026 Early Access Program for Designcenter” (Designcenter 2612): https://resources.sw.siemens.com/en-US/presentation-welcome-to-designcenter-early-access-program/ (retrieved 4 November 2026)