Connect PDM and ERP: The Short Version
To connect PDM and ERP for engineering AI, you read both systems, plus the wiki and the file servers, through their standard interfaces and link the records by one consistent project or order number. Nothing is replaced, nothing is written back. inteliScience builds this read-only layer for whatever CAD you run. The real effort is data quality, not technology.
The Problem: Four Systems, One Project, No Shared Key
A new RFQ arrives and the first question is always the same: have we built something like this before, and what did it cost? The answer exists. It is just spread over four places.
The design sits in the PDM. Costs, purchase orders and supplier history sit in the ERP. The reasons behind a design decision, and the lessons from commissioning, sit in a wiki. Specifications, test reports and customer correspondence sit on a file server, in a folder someone named years ago.
Each of these systems was introduced by a different team, for a different job, at a different time. None of them was designed to know what the others know.
An AI model does not change that on its own. A language model over one source answers questions about that one source. The value of engineering data AI (finding similar past projects, analyzing an incoming requirements specification against them, pulling real costs for a quotation) comes from the link between sources. This guide is about that link: how to build it without touching the systems themselves, and why the number on the project folder matters more than the choice of model.
What Each System Contributes to a Past-Project Record
Every source holds a different slice of the same project, and each has its own key. The table below is the map we start from. Note the last row: for metadata-based project search, the CAD system itself does not need to be connected at all.
| Source | What it knows about a past project | Typical key | Standard read path |
|---|---|---|---|
| PDM (commercial, or self-built on a SQL database) | Part and assembly numbers, names, structure, revisions, project assignment | Part number, project attribute | Vendor API or read-only SQL access |
| ERP (e.g. SAP Business One, SAP S/4HANA, Proalpha, Microsoft Dynamics 365 Business Central) | Articles, costs, purchase orders, suppliers, quotations | Article number, sales order or project number | The vendor’s standard REST or OData API |
| Wiki (e.g. Confluence or SharePoint) | Design decisions, lessons learned, commissioning notes | Page title, label, space | Confluence REST API, Microsoft Graph |
| File server (Windows shares, NAS) | Specifications, test reports, correspondence, exported drawings | Folder path, file name | Read-only share access |
| CAD (Siemens NX, CATIA, SolidWorks, Creo) | Geometry | Model file | Not needed for metadata search |
Part and assembly numbers, names, structure and project assignment already live in the PDM. That keeps the integration CAD-neutral: NX plus whatever else your suppliers or acquired sites use. Finding parts that look alike is a different job. Geometric similarity works on shapes, not metadata, and needs a one-time index over the part library, which is a separate project with separate prerequisites.
Read-Only Integration: Connect PDM and ERP Without Replacing Either
You do not need a new platform, a migration or a data warehouse to connect PDM and ERP for AI. Mainstream ERPs offer a standard read interface, a PDM on a SQL database can be read directly, and wikis and file servers have standard connectors. The AI layer reads. It never writes back.
Our clear recommendation is read-only in phase one, without exceptions. It changes no validated process, needs no new interface owner, gets through IT security review faster, and can be switched off without side effects. Write-back can come later, if a use case truly needs it.
The ERP side is less exotic than it sounds. SAP Business One exposes its data through the Service Layer, built on HTTP and OData (version 3 under /b1s/v1, version 4 under /b1s/v2). Its user guide reached document version 1.29 on 27 July 2026, which extended the webhooks: a receiving system can now filter events and get key data in the notification, so it learns about changes without polling. Microsoft Dynamics 365 Business Central offers API v2.0 with a projects resource that carries a number and a display name. SAP S/4HANA publishes released OData APIs on the SAP Business Accelerator Hub. And Proalpha announced in April 2026 that it will rely on an API-centric reference architecture and REST interfaces going forward.
Two read-only lookups, one per ERP, show how little is involved:
# Read-only project lookups through standard ERP APIs (GET only, nothing is written)
# SAP Business One Service Layer, OData v4 (after POST /b1s/v2/Login)
GET https://erp-host:50000/b1s/v2/Projects?$select=Code,Name,ValidFrom&$filter=startswith(Code,'P-24')
# Microsoft Dynamics 365 Business Central, API v2.0
GET https://api.businesscentral.dynamics.com/v2.0/{tenant}/{environment}/api/v2.0/companies({companyId})/projects?$select=number,displayName
The same read path delivers article, cost and procurement data for every hit, which is what turns a list of similar projects into a usable reference for a quotation.
Wikis and file shares follow the same principle. The Confluence Cloud REST API v2 returns only the pages the calling user may view. In SharePoint, Microsoft Graph’s Sites.Selected scope grants an application access to named sites only, with a read role, and in delegated mode the application never exceeds the user’s own permissions. A Windows file share is read through an account with read rights and nothing else.
One delimitation. This is the opposite direction from CAD-to-ERP BOM sync, which writes released structures into the ERP. That is a legitimate project with its own risk profile, change control and owners. Linking for AI only reads, so it never competes with it. The read-only pattern described here is the base of everything we build under engineering data AI.
The Project Number Is the Linking Thread
The cheapest link between four systems is a number they already share: the project, order or commission number of an engineer-to-order job. If the same number appears on the PDM project, the ERP sales order, the wiki page and the folder on the file server, linking is a join. If it does not, linking is still solvable, but it becomes part of the project.
| Situation in your data | What linking looks like | What drives the effort |
|---|---|---|
| Same number, same format in all four systems | Direct match | Access rights and permissions, little else |
| Same number, different formats (P-24017, P24017, 24017-A) | Agreed normalization rules | Agreeing on the rules with the data owners |
| Number missing in one source (e.g. wiki pages titled by topic) | Derived links via folder paths, article overlap and dates, confirmed by an engineer | Reviewing ambiguous matches |
| Numbering scheme changed, e.g. after an ERP switch | A mapping table, built once | Building the table and naming an owner for it |
Part numbers are the second thread. Either the PDM part number and the ERP article number are identical, or there is a maintained field that maps one to the other. Where neither exists, a hit in the PDM cannot be priced from the ERP until someone builds that mapping.
Do not expect naming to be stable, even inside one vendor’s product. Business Central replaced the term “jobs” with “projects” in its interface and documentation from 1 April 2024, while the underlying table and field names stayed as they were. Your own systems will carry similar drift: a project in one tool is an order in the next and a commission folder in the third.
We would rather spend the first day tracing a handful of completed projects by hand through all four systems than write a single connector. That tracing tells you more about the effort ahead than any architecture slide.
Data Quality, Not Technology, Is the Real Effort
Reading four systems is standard engineering. Whether the data agrees with itself is not. That is the main uncertainty in projects of this kind, and it is why effort estimates made before anyone looks at the data are guesses.
The pattern is not specific to engineering. Gartner predicts that through 2026, organizations will abandon 60% of AI projects unsupported by AI-ready data, and in its survey of 248 data management leaders in the third quarter of 2024, 63% either lacked the right data management practices for AI or were unsure whether they had them.
In engineering data, the gaps have recognizable shapes. Projects copied from an older project carry the old number in the PDM. A numbering scheme changed with the last ERP migration and nobody kept the mapping. Wiki pages are titled by topic or by machine type instead of by project. The most useful file server folders belong to colleagues who have left. None of this is unusual, and none of it stops a project. It just has to be found before it is promised away.
To be precise about scope: this is not a cleanup of part classification or characteristics in the master data. It is about whether a record in one system can find its counterpart in the others.
Our advice is to resist the big data-cleansing program. Clean what the first use case needs and nothing more: one product family and a handful of completed projects. That is the scope of our NX Sprint, and the Quick Scan with an on-site workshop before it looks at exactly the questions below, on your data.
Data-Readiness Checklist: Seven Questions Before You Connect PDM and ERP
Answer these before anyone writes a connector. Each “no” is not a blocker. It is a line item in the plan.
- One number per job: Is there one project or order number that identifies a job from quotation to delivery, in one agreed format?
- PDM carries it: Is the number a field or attribute on the project or top-level assembly, not only part of a folder name?
- ERP carries it where it matters: Does it appear on the sales order or project, and on purchase orders and cost postings?
- Wiki and file server carry it: In page titles, labels or spaces, and in folder paths?
- Part and article numbers match: Identical in PDM and ERP, or mapped by a maintained field?
- Completed means completed: Is there a status that separates finished projects from open ones and from lost quotations?
- Read access has an owner: For each source, who grants a read-only account or role, and who decides which data the AI may see?
Questions 1 to 4 can be measured with a few exports. Export the project numbers from each source (a directory listing of the project folders is enough for the file server) and run a trace test like this one:
# Data-readiness trace test: which project numbers appear in every source?
# Input: one CSV export per source with a column "project".
import csv
import re
from pathlib import Path
SOURCES = ["pdm.csv", "erp.csv", "wiki.csv", "fileserver.csv"]
def normalize(raw):
"""'P-24017', 'p24017 ', '24017-A' -> '24017'. Adapt the pattern to your scheme."""
match = re.search(r"(\d{5})", raw or "")
return match.group(1) if match else None
numbers = {}
for name in SOURCES:
with Path(name).open(newline="", encoding="utf-8") as f:
values = {normalize(row["project"]) for row in csv.DictReader(f)}
numbers[name] = {v for v in values if v}
in_all = set.intersection(*numbers.values())
in_any = set.union(*numbers.values())
print(f"{len(in_all)} of {len(in_any)} project numbers appear in all sources")
for name, values in numbers.items():
gaps = sorted(in_any - values)[:10]
print(f"{name}: {len(values)} numbers, first gaps: {gaps}")
If most numbers show up in all four sources, linking is mostly access work. If the intersection is small, the gap lists tell you which system breaks the thread, and whether a normalization rule or a mapping table will close it.
This trace runs as a POC on exports. What’s missing for production: access under each user’s own permissions, change detection instead of re-imports, citations back to the source record, and operation inside your own infrastructure. We take linked engineering data from a spreadsheet test to a search your engineers use daily: see how similar project search works on linked PDM and ERP data.
For Teamcenter and SAP specifically, our Teamcenter SAP integration page explains the standard connector, custom interfaces and how the transfer is tested.
Frequently Asked Questions
What is the difference between PDM and ERP?
PDM (product data management) manages engineering data: CAD models, drawings, part and assembly structures, revisions and release status. ERP (enterprise resource planning) manages the business side: articles, orders, costs, purchasing, inventory and production planning. In engineer-to-order work, every project lives in both, which is why linking them pays off.
Can you connect PDM and ERP without replacing either system?
Yes. Both can be read through standard interfaces, a vendor API or read-only database access for the PDM and the vendor’s REST or OData API for the ERP, while each system stays the master of its own data. For AI search and analysis, read-only access is enough; write-back is only needed for processes such as BOM transfer.
How do you link PDM and ERP records when part numbers differ between the systems?
Through a shared key: either a maintained field that maps PDM part numbers to ERP article numbers, or the project or order number both systems carry. Where neither exists, links are derived from overlaps such as article lists, dates and folder paths, and an engineer confirms the ambiguous ones. The work lies in agreeing on the rules, not in the matching code.
How much does it cost to connect PDM and ERP for an AI project?
It depends mainly on data quality and on the number of sources, not on the interfaces, which are standard. If one project number runs consistently through every system, linking is a small part of the project; if it does not, building the mapping becomes the main effort. A bounded proof of value on one product family and a handful of completed projects gives a reliable estimate before any larger commitment.
Is it safe to give an AI system read access to ERP, SharePoint and Confluence data?
It can be, as long as the AI inherits the permissions of the source systems instead of bypassing them. The Confluence REST API returns only pages the calling user may view, and Microsoft Graph’s Sites.Selected scope limits an application to named SharePoint sites with a read role. Keep the index and the model inside your own infrastructure or private cloud, and log every query.
Next Step
Pick one completed project you know well and check whether its number shows up in all four places. Then talk to inteliScience: CAD-neutral engineers with deep Siemens NX roots, delivering nearshore from Romania for DACH manufacturers. We will tell you what a Quick Scan with an on-site workshop on your data would look at and where the thread is likely to break.
Related Topics
- AI similar project search for incoming RFQs
- Cost estimation from comparable past projects
- Measuring CAD data quality
Sources
- Gartner, “Lack of AI-Ready Data Puts AI Projects at Risk”, press release, 26 February 2025 (60% of AI projects unsupported by AI-ready data abandoned through 2026; 63% of 248 data management leaders surveyed in Q3 2024), retrieved 8 September 2026
- SAP, Working with SAP Business One Service Layer, user guide, document version 1.29 of 27 July 2026 (HTTP and OData v3/v4, webhook enhancements), and the Service Layer API Reference (Projects entity), help.sap.com, retrieved 8 September 2026
- Microsoft Learn, Business Central API v2.0, project resource type (id, number, displayName), and Use standard terminology for project management (jobs renamed to projects, general availability 1 April 2024, table and field names unchanged), retrieved 8 September 2026
- Proalpha, “Proalpha enters into strategic partnership with n8n”, April 2026 (API-centric reference architecture and REST interfaces), retrieved 8 September 2026
- Microsoft Learn, Overview of Selected Permissions in OneDrive and SharePoint (Sites.Selected, read role, delegated access never exceeds the user’s permissions), retrieved 8 September 2026
- Atlassian, Confluence Cloud REST API v2, Page (scope
read:page:confluence, only pages the user may view), retrieved 8 September 2026