MBD and 2D Drawings from One Siemens NX Model: PMI as the Master, the Drawing Derived by Vision4NX
This MBD and 2D drawings case study shows how a mid-sized machine builder in the DACH region, referred to here as the DACH machine builder, works model-based without dropping the 2D drawing that its suppliers and its own processes still need. The DACH machine builder authors the PMI once in Siemens NX as its MBD master, and Vision4NX, our AI assistant for Siemens NX, derives the 2D drawing from it, interactively in the NX session and in batch runs that are in production use; what remains for the drawing is a check of a few minutes. Our PMI placement and numbering case study covers a different client and a different step, placing and numbering PMI on the model; this case study covers what the PMI feeds downstream: the drawing.
MBD and 2D drawings case study, in short: a mid-sized DACH machine builder with 50 users gets MBD and the 2D drawing from one Siemens NX model, and the extra effort for each drawing comes down to a few minutes of checking. The PMI is authored once as the MBD master, and Vision4NX derives the 2D drawing from it, interactively and in batch runs in production use.
Result confirmed qualitatively by the client: a statement by the client, not a formal measurement. Status October 2026.
- Client
- Mid-sized machine builder, DACH regionname not published
- Sector
- Machine building
- Users
- 50client-confirmed
- Software
- Siemens NX, Vision4NX
- Vision4NX modules
- Drawing, Modeling, Sheet Metaldrawing derivation in this case study
- MBD master
- PMI on the 3D model2D drawing derived from it
- Operation
- Interactive and batchbatch runs in production use
- Drawing check
- A few minutes per drawingclient statement
- Our role
- Vision4NXinteliScience SRL
The situation: MBD as the goal, 2D drawings still required
The DACH machine builder wants to focus on model-based definition (MBD), with the PMI on the 3D model as the master. Neither its suppliers nor its own internal processes are ready to drop the 2D drawing completely. Before the project, the MBD model and the 2D drawing were therefore maintained separately, and the same information was defined twice.
Companies that define PMI on the model but still deliver 2D drawings are common across discrete manufacturing. In a literature review for the US National Institute of Standards and Technology (NIST AMS 100-26, August 2019), Douglas Thomas reports survey data from Lifecycle Insights in which only 26.8 percent of respondents had released 51 percent or more of their designs with PMI-embedded 3D models, while 38.2 percent released all of their designs with 2D drawings and another 30.1 percent most of them (76 to 99 percent). The same review cites the Lifecycle Insights 2014 State of Model Based Enterprise Report, in which engineers reported spending on average 21.3 hours per week creating drawings, plus 6.4 hours answering questions and clarifying drawings. Source: NIST AMS 100-26. These are industry figures from named sources, not results of this project.
Where MBD ends and the drawing is still needed is covered in our guide MBD vs 2D drawing in NX.
What changed: before and after
What changed is the number of masters per part: two maintained separately before, one PMI master with a derived drawing now, and a check of a few minutes instead of a second round of drawing work.
BeforeMBD model and drawing maintained separately
- Master3D model with PMI, plus a separately maintained 2D drawing
- DrawingSame information defined a second time, double work
- Design changeModel and drawing updated separately
- Many partsEach drawing maintained on its own
AfterPMI authored once, drawing derived
- MasterPMI on the 3D model is the single MBD master
- DrawingViews and annotations derived from the PMI by Vision4NX, then checked in a few minutes
- Design changeDrawing taken from the current PMI
- Many partsBatch runs in production use, plus interactive use in the NX session
What the results are based on
The results are qualitative and come from the DACH machine builder itself: the PMI is authored once as the MBD master, the 2D drawing is derived from it, interactively or in batch, and the remaining effort per drawing is a check of a few minutes. There is no formal before and after measurement, and none is claimed here.
Extra effort for the 2D drawing
A second drawing maintained by handA few minutesof checking per drawing
Client-confirmed (qualitative): this is the statement of the client, not a formal measurement. With the PMI as the MBD master, the work that remains on the 2D drawing is checking the derived drawing.
MBD master and 2D drawing
Maintained separately, double workOne masterPMI authored once, drawing derived
Client-confirmed (qualitative): the PMI on the 3D model is the MBD master, and the 2D drawing that suppliers and internal processes still need is derived from it instead of being maintained by hand.
Batch derivation
Each drawing maintained on its ownIn production use
Client-confirmed (qualitative): 2D drawings for many parts are derived from the PMI in batch runs, without a designer at the screen.
What does Siemens NX do, and what does Vision4NX add?
Siemens NX can inherit the PMI of a model into drafting views, filtered by model view or annotation plane, so the drawing shows the dimensions, tolerances and notes defined on the model. Base, projected and detail views inherit PMI, and so do simple, stepped, half and pictorial section views.
Native NX shows PMI in views that someone has created and placed. At the DACH machine builder, Vision4NX takes over creating the drawing: it derives the 2D drawing from the PMI, for the open part in the NX session and for many parts in batch runs, and the engineer checks the result. The annotations on the sheet come from the PMI, so the AI does not choose a dimension or a tolerance, and it never decides whether a drawing passes. In interactive use each change is one undo step, and a step that NX rejects is rolled back. Vision4NX does not release drawings; release stays with the engineer.
For parts whose models carry little or no PMI, a drawing can instead be dimensioned directly on the drafting view, as described on our page on AI 2D drawing creation in Siemens NX. How templates, master model drawings, PMI inheritance and batch drafting work in NX in general is explained in our NX drawing automation whitepaper.
Can 2D drawings be derived from PMI in batch?
2D drawings can be derived from PMI in batch, and at the DACH machine builder this batch process is in production use. Interactive use covers the part that is open in the NX session; batch runs cover many parts without a designer at the screen. In both modes the engineer checks and releases the drawing.
What the solution is built on
The solution runs in Siemens NX on the models of the DACH machine builder. The client has licensed the Vision4NX modules Drawing, Modeling and Sheet Metal; this case study is about the drawing derivation.
- CAD
- Siemens NX
- client environment
- MBD master
- PMI on the 3D model
- authored by the client
- Drawing
- Vision4NX Drawing module: 2D drawing derived from the PMI, interactive and batch
- Vision4NX by inteliScience
- Modeling
- Vision4NX Modeling module, licensed by the client
- Vision4NX by inteliScience
- Sheet metal
- Vision4NX Sheet Metal module, licensed by the client
- Vision4NX by inteliScience
- Release
- Engineer; Vision4NX does not release drawings
- client process
What we would do differently
For the next rollout we would check the PMI of a sample of models for model views and annotation planes before the first batch run, because a derived drawing is only as complete as the PMI behind it. We would also name the known Siemens NX limits at the start: PMI is not inherited into revolved or folded section views, PMI on geometry that a section cut removes stays out of that view, and inherited PMI only updates when the model is fully loaded. Parts that depend on such views need a planned manual step.
When does running MBD and 2D drawings from one model pay off?
Running MBD and 2D drawings from one model pays off when a company wants to move to MBD but its suppliers or its own processes still need drawings, when the models already carry complete PMI on clear model views or annotation planes, and when many parts need a drawing. The more often parts are revised, the more it matters that the drawing comes from the PMI instead of being maintained by hand.
Frequently asked questions
Can you use MBD and 2D drawings at the same time in Siemens NX?
How do you derive a 2D drawing from PMI in Siemens NX?
Do suppliers still need 2D drawings when a manufacturer uses model-based definition?
How much effort does deriving 2D drawings from PMI in Siemens NX take?
When is deriving 2D drawings from PMI in Siemens NX not worth it?
Why do MBD case studies often leave the manufacturer unnamed?
Moving to MBD while your suppliers still want drawings?
Send us one part with PMI and the drawing that leaves your company today. Someone from our team will show you which views and annotations Vision4NX derives from the PMI.
Request a technical conversation